GEM

Indian Army MT3 Electrical Components Tender Allahabad Uttar Pradesh 210010 25% Quantity Option 2025

Bid Publish Date

15-Dec-2025, 11:23 pm

Bid End Date

26-Dec-2025, 9:00 am

Progress

Issue15-Dec-2025, 11:23 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

52

Category

MT3 6240 001143 BULB 12 V 21W

Categories 15

Tender Overview

The opportunity is an Indian Army procurement under the Department Of Military Affairs for multiple MT3 electrical components and assemblies listed in the BOQ, with an estimated value not disclosed. Location is ALLAHABAD, UTTAR PRADESH - 210010. The scope includes items such as bulbs, housings, isolators, switches, lever assemblies, gear levers, and related sub-assemblies, with 19 total BOQ items referenced. A notable differentiator is the explicit option clause allowing up to 25% quantity variation at contracted rates, and a flexible delivery schedule linked to last delivery order date. This tender emphasizes standard delivery terms and option-driven expansion during the contract period, without published start/end dates.

Technical Specifications & Requirements

  • No explicit product specifications provided in the tender text; the BOQ references a broad list of military electrical components (e.g., BULB 12 V 21W, ISOLATOR SWITCH, WHEEL CYL ASSY, ROTARY SWITCH, LEVER ASSY, DOOR LOCK ASSY, FOG LIGHT ASSY).
  • The buyer’s terms require compliance with the option clause: quantity may be increased by up to 25% during contract, at contracted rates; delivery timeline calculates extended time based on the ratio of additional to original quantity, with a minimum of 30 days.
  • The absence of standard specifications suggests bidders must rely on OEM literature, IS/IEC references, or Army-approved drawings for component-level compliance.
  • EMD, delivery schedules, and exact performance standards are not disclosed in the provided text.
  • Focus on compatibility with military electrical assemblies and proper installation readiness for all listed items.

Terms, Conditions & Eligibility

  • Option Clause allows up to 25% quantity increase, with calculated extended delivery time and possible further extension to the original delivery period.
  • Delivery period terms reference the last date of the original delivery order; extended times are proportionate to the quantity change, subject to a minimum of 30 days.
  • Bidders must comply with the option-based delivery framework; other standard terms and safeguards apply per buyer’s terms.
  • No explicit EMD amount or payment terms are provided in the data; bidders should prepare standard security deposits per Army procurement norms.
  • Documentation and eligibility criteria require alignment with departmental practices, including OEM authorizations where applicable and compliance with security clearance for defense equipment suppliers.

Key Specifications

    • Product names from BOQ: BULB 12 V 21W, ISOLATOR SWITCH, HOUSING WITH FD COIL, WHEEL CYL ASSY, ROTARY SWITCH, LEVER ASSY, COMBINATION SWITCH, DOOR LOCK ASSY, FOG LIGHT ASSY, GEAR LEVER KIT, FIELD COIL ASSY, SPEEDOMETER CABLE
    • Quantities/values: not disclosed; 19 BOQ items referenced
    • Delivery terms: delivery period starts from last date of original delivery order; extension formula provided
    • Special clause: up to 25% quantity variation at contracted rates
    • Documentation: no explicit technical standards listed; prepare OEM documentation and defense-grade compliance

Terms & Conditions

  • Option clause enabling 25% quantity increase at contracted rates

  • Delivery period ties to last original delivery order date with minimum 30 days extension

  • No published start/end dates or EMD amount in data; rely on standard Army procurement practices

Important Clauses

Payment Terms

Not specified in tender data; bidders should anticipate standard defense payment terms per Army policy and include security deposits as required

Delivery Schedule

Delivery begins after original order; additional quantity extends delivery time proportionally with a minimum of 30 days

Penalties/Liquidated Damages

Not specified in data; bidders should seek clarification on LDs and penalties during bidding

Bidder Eligibility

  • Experience in supplying defense/electrical components

  • Compliance with OEM authorizations and certifications

  • Financial capability to handle multi-item, variable-quantity contracts

Past Similar Tenders (Historical Results)

5 found

TATA 270 2910 0115 ASSY CLUTCH MASTER CYL,STLN 2530 17915 F 8080200 DUAL BRAKE VALVE,TATA 2573 4242

Indian Army

ALLAHABAD, UTTAR PRADESH

Posted: 28 October 2025
Closed: 7 November 2025
GEM

LV7 STLN VF 2920-72-0000349 ISOLATOR SWITCH,LV7 STLN VF 5360-72-0472263 SPRING LEAF,LV7 STLN P-1306

Indian Army

LEH, JAMMU & KASHMIR

Posted: 6 April 2025
Closed: 28 April 2025
GEM

LV7 TMB 2752 2540 0101 ASSY RELEASE BEARING,LV7 TMB 2654 2910 0194 ASSY CLUTCH MASTER CYLINDER,LV7

Indian Army

FAIZABAD, UTTAR PRADESH

Posted: 10 July 2025
Closed: 25 July 2025
GEM

LV7 TATA L01402000036 FIELD COIL ASSY,LV7 TATA L01402000035 ARMATURE ASSY,LV7 TATA 283954249903 RPM

Indian Army

FAIZABAD, UTTAR PRADESH

Posted: 28 December 2024
Closed: 18 January 2025
GEM

LV7 MG 15710M83F00 INJECTOR ASSY FUEL,LV7 MG 15100M830A1 PUMP ASSY FUEL,LV7 STLN P 1310439 COVER AS

Indian Army

FAIZABAD, UTTAR PRADESH

Posted: 16 May 2025
Closed: 6 June 2025
GEM

Bill of Quantities (BOQ) 19 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 MT3 6240 001143 BULB 12 V 21W MT3 6240 001143 BULB 12 V 21W 20 nos wksptechn@803fwc 15
2 STLN F 9601600 HOOD LIGHT STLN F 9601600 HOOD LIGHT 6 nos wksptechn@803fwc 15
3 TMB 2920 000135 ARMATURE TMB 2920 000135 ARMATURE 1 nos wksptechn@803fwc 15
4 STLN P 1302318 HOUSING WITH FD COIL STLN P 1302318 HOUSING WITH FD COIL 1 nos wksptechn@803fwc 15
5 STLN 5930 72 0466969 ISOLATOR SWITCH STLN 5930 72 0466969 ISOLATOR SWITCH 4 nos wksptechn@803fwc 15
6 TATA 2573 5420 9931 BTY ISOLATOR SWITCH TATA 2573 5420 9931 BTY ISOLATOR SWITCH 1 nos wksptechn@803fwc 15
7 TATA 2574 4215 0113 WHEEL CYL ASSY TATA 2574 4215 0113 WHEEL CYL ASSY 1 nos wksptechn@803fwc 15
8 MT3 5930 000538 ROTARY SWITCH MT3 5930 000538 ROTARY SWITCH 1 nos wksptechn@803fwc 15
9 MG 31191M85020 LEVER ASSY MG 31191M85020 LEVER ASSY 1 nos wksptechn@803fwc 15
10 TMB 2780 5950 0102 COMBINATION SWITCH TMB 2780 5950 0102 COMBINATION SWITCH 1 nos wksptechn@803fwc 15
11 MG 1189 826002 TAPPET GASKET MG 1189 826002 TAPPET GASKET 2 nos wksptechn@803fwc 15
12 MT3 6220 004440 FOG LIGHT ASSY MT3 6220 004440 FOG LIGHT ASSY 2 nos wksptechn@803fwc 15
13 STLN P 4802039 CLUTCH PLATE STLN P 4802039 CLUTCH PLATE 2 nos wksptechn@803fwc 15
14 STLN 2520 72 0473321 SPEEDOMETER CABLE STLN 2520 72 0473321 SPEEDOMETER CABLE 1 nos wksptechn@803fwc 15
15 STLN X 8000600 COMBINATION SWITCH STLN X 8000600 COMBINATION SWITCH 1 nos wksptechn@803fwc 15
16 TATA 2641 2680 0227 GEAR LEVER KIT TATA 2641 2680 0227 GEAR LEVER KIT 2 nos wksptechn@803fwc 15
17 TMB 2751 1540 0111 FIELD COIL ASSY TMB 2751 1540 0111 FIELD COIL ASSY 1 nos wksptechn@803fwc 15
18 TMB 012 760 0031J DOOR LOCK ASSY LH TMB 012 760 0031J DOOR LOCK ASSY LH 2 nos wksptechn@803fwc 15
19 TMB 012 760 0231J DOOR LOCK ASSY RH TMB 012 760 0231J DOOR LOCK ASSY RH 2 nos wksptechn@803fwc 15

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration

2

PAN card

3

Experience certificates relevant to defense/electrical components

4

Financial statements (last 2-3 years)

5

EMD/Security deposit documents (as per buyer norms)

6

Technical bid documents and OEM authorizations (if required)

7

Any applicable ISI/ISO or manufacturer certifications

8

Company profile and past performance in similar procurements

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for Indian Army MT3 electrical components in Allahabad?

Bidders must submit GST, PAN, experience certificates, financial statements, and EMD as per buyer terms. Provide OEM authorizations and technical compliance where applicable. The tender allows up to 25% quantity variation at contracted rates, with delivery time calculated from the last delivery order date.

What documents are required for defense electrical tender in Allahabad?

Required documents include GST registration, PAN, experience certificates in defense supply, financial statements, EMD/Security deposit, technical bid and OEM authorizations, and any ISI/ISO certifications relevant to the components listed (bulbs, switches, door locks, etc.).

What is the delivery period for 25% quantity increase in this Army tender?

Delivery time starts from the last date of the original delivery order; extended time equals (Additional quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. The purchaser may extend to the original delivery period.

What standards or certifications are required for MT3 components?

The tender text does not specify exact standards; bidders should rely on OEM literature and Army-approved drawings, and procure any defense-grade certifications or IS/ISO as applicable to each component (e.g., ISI for safety-critical parts).

What is the eligibility for experience in defense procurement in UP?

Eligible bidders should demonstrate prior experience in supplying similar electrical/military components, possess financial viability, and provide OEM authorizations when required by the Army procurement terms.

When is the bid submission deadline for the Allahabad MT3 tender 2025?

The tender data provided does not include a submission deadline; bidders should monitor the official portal for updated dates and ensure timely submission of all required documents and bid envelopes per Army guidelines.

Are there penalties for late delivery in this Indian Army tender?

Specific penalty clauses are not disclosed in the data; bidders should clarify LD terms during bid submission and prepare to meet delivery milestones as per last order date and any extended schedule under the option clause.

How to verify OEM authorizations for defense components in UP?

Obtain official OEM authorization letters, cross-check component part numbers with Army-approved specifications, and attach originals or certified copies to the technical bid to demonstrate supply capability.