East Central Railway Fitter Trainee Tool Kit Tender DARBHANGA Bihar 2025

Bid Publish Date

07-Nov-2025, 10:14 am

Bid End Date

16-Dec-2025, 9:00 am

Latest Corrigendum Available

Progress

Issue07-Nov-2025, 10:14 am
Corrigendum08-Dec-2025
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

2

Bid Type

Single Packet Bid

Key Highlights

  • Explicit quantity variation up to 25% with contracted rates
  • Delivery period linked to last date of original order; extended period rules defined
  • Post-receipt inspection at consignee site (no pre-dispatch if ATC not specified)
  • Scope limited to supply of Goods (no services/installation mentioned)
  • ATC document uploaded by Buyer governs terms
  • Location-specific tender: Darbhanga, Bihar under East Central Railway

Categories 3

Tender Overview

Organization: East Central Railway (Indian Railways) – procurement of a fitter trainee tool kit under Skill Development India, in DARBHANGA, BIHAR. Estimated value and exact quantity are not disclosed; scope is limited to the supply of Goods with a 25% quantity escalation option. The award will follow post-receipt inspection at the consignee site; pre-dispatch inspection is not invoked. The agreement allows extension of delivery time proportionate to increased quantities, with a minimum 30 days. This tender requires bidders to align with ATC terms uploaded by the buyer. Key differentiator is the explicit option clause for quantity variation and extended delivery timelines.

Technical Specifications & Requirements

  • Product category: Fitter trainee tool kit for skill development (Q3).
  • Delivery/inspection: Post-receipt inspection at consignee site; pre-dispatch inspection not applicable unless ATC specifies otherwise.
  • Scope: Only supply of Goods; no services or installation included.
  • Quantity flexibility: Up to 25% increase in bid quantity at contracted rates; additional time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days. Delivery period from last date of original delivery order; extended period applies if option exercised.
  • Documentation: Tender requires adherence to ATC uploaded by Buyer and compliance with movement of goods terms. No BOQ items available in this notice.
  • Location relevance: Tender relates to the East Central Railway region, specifically Darbhanga, Bihar.

Terms, Conditions & Eligibility

  • Delivery terms: Delivery period governed by last date of original delivery order; extension rules apply under the option clause.
  • Inspection: Post-receipt inspection at consignee site; pre-dispatch inspection not mandated in ATC.
  • EMD/Payments: Not disclosed in the notice; bidders should prepare typical EMD and bid security as per standard railway practice. Ensure readiness for milestone payments on delivery.
  • Eligibility: Compliance with ATC terms; ability to supply goods within railway procurement standards; adherence to quality and conformity requirements for tool kits used in vocational training.
  • Documentation: Submit standard bidder documents (GST, PAN, experience certificates, financials) along with technical bid and OEM authorizations as applicable.

Key Specifications

  • Product/service: Fitter trainee tool kit (Skill Development India)

  • Estimated value: Not disclosed in tender

  • Quantity: Not disclosed; quantity flexibility up to 25%

  • Standards/Certification: Not specified in notices

  • Delivery: From last date of original delivery order; minimum extension 30 days

Terms & Conditions

  • Delivery period adjustable with 25% quantity variation

  • Post-receipt inspection at consignee site

  • Supply of Goods only; no installation services specified

Important Clauses

Payment Terms

Not explicitly stated in the notice; bidders should anticipate standard railway practices and ATC guidance for milestone payment terms.

Delivery Schedule

Delivery period starts from the last date of the original delivery order; option clause allows extended time proportional to increased quantity with a minimum 30 days.

Penalties/Liquidated Damages

Not specified in the public notice; bidders should refer to ATC/contract for LD provisions if extended delivery is invoked.

Bidder Eligibility

  • Experience in supplying tool kits or similar vocational training equipment

  • Ability to comply with railway ATC terms and post-receipt inspection regime

  • Demonstrated financial stability with recent financial statements

Past Similar Tenders (Historical Results)

5 found

Mechanic machine tool maintenance trainee tool kit (Skill India Program)

Indian Air Force

JODHPUR, RAJASTHAN

Posted: 3 June 2025
Closed: 12 June 2025
GEM

Mechanic machine tool maintenance trainee tool kit (Skill India Program)

Indian Air Force

SIRSA, HARYANA

Posted: 19 September 2025
Closed: 22 September 2025
GEM

Mechanic machine tool maintenance trainee tool kit (Skill India Program)

Indian Air Force

GWALIOR, MADHYA PRADESH

Posted: 5 August 2025
Closed: 23 August 2025
GEM

Mechanic Motor Vehicle trainee tool kit (Skill India Program)

Indian Army

AHMEDABAD, GUJARAT

Posted: 6 January 2025
Closed: 8 January 2025
GEM

Mechanic Motor Vehicle trainee tool kit (Skill India Program)

Indo Tibetan Border Police (itbp)

SONIPAT, HARYANA

Posted: 3 February 2025
Closed: 19 February 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar tool kit supply

4

Financial statements / turnover proof

5

EMD/surety deposit as per railway guidelines

6

Technical bid documents

7

OEM authorizations or confirmations (if applicable)

8

Any ATC-specific compliance certificates

Corrigendum Updates

3 Updates
#1

Update

08-Dec-2025

Extended Deadline

16-Dec-2025, 9:00 am

Opening Date

16-Dec-2025, 9:30 am

#2

Update

27-Nov-2025

Extended Deadline

05-Dec-2025, 9:00 am

Opening Date

05-Dec-2025, 9:30 am

#3

Update

20-Nov-2025

Extended Deadline

27-Nov-2025, 9:00 am

Opening Date

27-Nov-2025, 9:30 am

Frequently Asked Questions

Key insights about BIHAR tender market

How to bid for fitter trainee tool kit tender in Darbhanga Bihar 2025

Bidders should review ATC terms, prepare GST, PAN, experience certificates, financials, EMD, and OEM authorizations. Ensure post-receipt inspection readiness and note quantity variation up to 25% with rates fixed at contract. Delivery terms follow last delivery date; extended time minimum 30 days.

What documents are required for East Central Railway tool kit tender 2025

Submit GST certificate, PAN card, experience certificates for similar supplies, financial statements showing stability, EMD/surety as per railway guidelines, technical bid documents, OEM authorizations if applicable, and any ATC-specific compliance certificates.

What are the delivery terms and inspection for this railway procurement

Delivery begins from the last date of the original delivery order; option clause allows up to 25% more quantity with extended delivery time. Post-receipt inspection will be conducted at the consignee site; pre-dispatch inspection is not required unless ATC specifies.

What standards or certifications are required for the tool kit supply

The tender note does not specify explicit standards. Bidder must comply with ATC terms and railway procurement norms; ensure OEM authorization if the toolkit requires brand-specific components and quality assurance documents per East Central Railway guidelines.

When is the delivery deadline if quantity is increased under option clause

Extended delivery time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. If original period is shorter than 30 days, extended time equals the original period.

What is the scope of supply for this East Central Railway tender

Scope is strictly the supply of goods (tool kit) with no on-site installation or services. Only supply of goods is included in the bid price, per the buyer’s terms.

What is the inspection regime for post-delivery acceptance

Post-receipt inspection will be conducted at the consignee site before acceptance. Pre-dispatch inspection is not mandated unless specified in the ATC uploaded by the buyer.

What is theBid submission readiness for East Central Railway tool kit tender

Prepare standard bid package with technical bid, financial bid, EMD, GST/PAN, experience certificates, financial statements, and OEM authorizations; ensure ATC-compliant submission and readiness for post-receipt inspection at the consignee site.