GEM

Government Tender Published for Bathroom Water Shower (V2),Bathroom Water Shower (V2),Bathroom Water Shower (V2),Prelaminated Parti in DARJEELING, WEST BENGAL

Bid Publish Date

02-Dec-2025, 6:23 pm

Bid End Date

18-Dec-2025, 7:00 pm

EMD

₹16,000

Latest Corrigendum Available

Progress

Issue02-Dec-2025, 6:23 pm
Corrigendum15-Dec-2025
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

555

Category

Rotational Moulded Polyethylene Water Storage Tanks (V3) Conforming to IS 12701

Bid Type

Two Packet Bid

Categories 6

Indian Army has released a public tender for Bathroom Water Shower (V2) (Q3), Prelaminated Particle Boards From Wood and Other Lignocellulosic Material (V2) as per IS 12823 (Q3), Rotational Moulded Polyethylene Water Storage Tanks (V3) Conforming to IS 12701 (Q3) in DARJEELING, WEST BENGAL. Quantity: 555. Submission Deadline: 18-12-2025 19: 00: 00. Download documents and apply online.

Past Similar Tenders (Historical Results)

5 found

Bathroom Water Shower (V2),Bathroom Water Shower (V2)

Nuclear Power Corporation Of India Limited

KANCHIPURAM, TAMIL NADU

Posted: 11 July 2025
Closed: 30 July 2025
GEM

Bathroom Water Shower (V2)

Central Public Works Department (cpwd)

SOUTH WEST DELHI, DELHI

Posted: 22 March 2025
Closed: 27 March 2025
GEM

Bathroom Water Shower (V2)

Hindustan Aeronautics Limited (hal)

SULTANPUR, UTTAR PRADESH

Posted: 19 April 2025
Closed: 10 May 2025
GEM

Bathroom Water Shower (V2),Bathroom Water Shower (V2),Bathroom Water Shower (V2),Bathroom Water Sho

Indian Army

Posted: 1 September 2025
Closed: 11 September 2025
GEM

Rotational Moulded Polyethylene Water Storage Tanks (V2) conforming to IS 12701,Rotational Moulded

Indian Army

HYDERABAD, TELANGANA

Posted: 7 February 2025
Closed: 17 February 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

Additional Doc 1 (Requested in ATC)

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

2 Updates
#1

Update

15-Dec-2025

Extended Deadline

18-Dec-2025, 7:00 pm

Opening Date

18-Dec-2025, 7:30 pm

#2

Update

12-Dec-2025

Extended Deadline

15-Dec-2025, 7:00 pm

Opening Date

15-Dec-2025, 7:30 pm