GEM

Indian Army Winded Starter Generator Field Components Tender 2025 - Starter Kit, Coil Ignition, Bearing Bush, Waterproof Motor

Bid Publish Date

13-Dec-2025, 12:18 pm

Bid End Date

23-Dec-2025, 1:00 pm

Progress

Issue13-Dec-2025, 12:18 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

8

Category

WINDING STARTER GENERATOR FIELD

Bid Type

Two Packet Bid

Key Highlights

  • Technical scope includes winding starter generator field components and waterproof 5-8 kW 24V starter motor
  • 20-25% quantity variation option during contract per Buyer Added Terms
  • ATC document uploaded by buyer may contain specific compliance and brand/OEM requirements
  • No explicit IS/ISO standards listed in data; confirm during bidder briefing
  • Potential need for military-grade components and compatibility with existing Indian Army systems
  • Delivery timeline adjusts with option clause; verify lead times and extended delivery period

Categories 16

Tender Overview

Organization: Indian Army (Department Of Military Affairs). Procurement covers winded starter generator field components including starter kit, coil assembly ignition, bearing bush interboard, and waterproof starter motor 5-8 kW at 24V. Estimated value and precise quantities are not disclosed; tender spans multiple related items. Tender location is not specified in the data; however, procurement targets military electrical components for field use. The unique aspect is the declared option clause allowing quantity variation up to 25% of bid quantity during contract execution, at contracted rates. This bid emphasizes compatibility with heavy-duty automotive/electrical starter subsystems and ATC terms uploaded by the buyer.

Technical Specifications & Requirements

  • No explicit technical specifications provided in the data; items include: WINDING STARTER GENERATOR FIELD, STARTER KIT, BRUSH GEAR ASSY, COIL ASSY IGNITION, BEARING BUSH INTER BKT, WATER PROOF STARTER MOTOR 5-8 KW 24W.
  • Buyers may reference the uploaded ATC document for conditions; the 25% quantity variation is a key commercial parameter. Expect alignment with military-grade electrical components and 24V waterproof motor standards.
  • Delivery terms, quality standards, and OEM/brand requirements are not specified here, and bidders should verify with the ATC upload.

Terms, Conditions & Eligibility

  • EMD/ security deposit details are not explicitly stated in the summary; bidders should review the ATC for exact amount and payment method.
  • Delivery period is tied to the option clause; time extensions may follow the formula: (increased quantity ÷ original quantity) × original delivery period, minimum 30 days.
  • Payment terms and warranty/penalties are not specified in the provided data and require ATC confirmation.
  • Ensure readiness with standard procurement documents: GST, PAN, experience certificates, and OEM authorizations per ATC.

Key Specifications

    • Product/service names: WINDING STARTER GENERATOR FIELD, STARTER KIT, BRUSH GEAR ASSY, COIL ASSY IGNITION, BEARING BUSH INTER BKT, WATER PROOF STARTER MOTOR 5-8 KW 24V
    • Quantity: Not disclosed in data; tender allows up to 25% quantity variation
    • Estimated value: Not disclosed
    • Experience: Not specified; verify in ATC
    • Standards: Not specified in data; confirm ISO/IS or military specs in ATC

Terms & Conditions

  • Option clause allows 25% variation in quantity during contract

  • Delivery period calculation includes minimum 30 days for extensions

  • Review ATC for exact EMD, payment, and warranty requirements

Important Clauses

Payment Terms

Payment terms to be defined in ATC; bidders should verify advance/ milestone payment details and any security deposit requirements

Delivery Schedule

Delivery starts after order; extended delivery period calculated by (increased quantity ÷ original quantity) × original delivery period; minimum 30 days

Penalties/Liquidated Damages

LD/penalty details to be specified in ATC; bidders must review for late delivery penalties

Bidder Eligibility

  • Experience in supplying military-grade electrical components

  • GST registration and PAN provided

  • OEM authorization or authorized dealership for required components

Past Similar Tenders (Historical Results)

5 found

BRUSH GEAR ASSY,SOLENOID SWITCH,FIELD COIL ASSY,SELF STARTER ASSY,ARMATURE ASSY,ALTERNATOR ASSY,FUE

Indian Army

LEH, JAMMU & KASHMIR

Posted: 18 December 2024
Closed: 8 January 2025
GEM

Self Starter Housing Kit,Field Coil Assy,Bush Set,Brush Gear Assy,Relay 5 Pin,Field Coil Assy,Pole

Indian Army

AMRITSAR, PUNJAB

Posted: 23 August 2025
Closed: 6 September 2025
GEM

Indian Army Department Of Military Affairs Armature Motors & Related Components Tender Bathinda Punjab 2025

Indian Army

BATHINDA, PUNJAB

Posted: 31 October 2025
Closed: 13 November 2025
GEM

RELAY FUEL,IGNITION SWITCH WITH LOCK,BUSH BEARING SELF,SELF STARTER ASSY BS-III,BRUSH GEAR ASSY,FIP

Indian Army

AMRITSAR, PUNJAB

Posted: 24 January 2025
Closed: 14 February 2025
GEM

Cover Assy Clutch,DISC Clutch,Bearing Clutch Release,Armature Assy,Winding Starter Generator Field,

Indian Army

Posted: 9 December 2024
Closed: 30 December 2024
GEM

Bill of Quantities (BOQ) 6 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 WINDING STARTER GENERATOR FIELD WINDING STARTER GENERATOR FIELD 2 pieces sujay_336@gem 60
2 STARTER KIT STARTER KIT 1 pieces sujay_336@gem 60
3 BRUSH GEAR ASSY BRUSH GEAR ASSY 1 pieces sujay_336@gem 60
4 COIL ASSY IGNITION COIL ASSY IGNITION 1 pieces sujay_336@gem 60
5 BEARING BUSH INTER BKT BEARING BUSH INTER BKT 2 pieces sujay_336@gem 60
6 WATER PROOF STARTER MOTOR 5 8 KW 24W WATER PROOF STARTER MOTOR 5 8 KW 24W 1 pieces sujay_336@gem 60

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar electrical component supply

4

Financial statements (audited if available)

5

EMD/Security deposit document (as per ATC)

6

Technical bid certificate and compliance statements

7

OEM authorization letters (if bidding as an authorized dealer)

8

Any specific ATC-submitted documents referenced by the buyer

Frequently Asked Questions

Key insights about UTTARAKHAND tender market

How to bid for Indian Army winded starter generator components tender 2025?

bidders must submit all required documents per ATC: GST, PAN, experience certificates, financials, EMD, and OEM authorizations. Review the ATC for exact EMD amount and payment terms; ensure compliance with the 25% quantity variation clause and delivery extension rules.

What documents are required for army electrical components tender 2025?

Required documents include GST registration, PAN, audited financial statements, experience certificates for similar projects, EMD/Security deposit as per ATC, technical bid certificates, and OEM authorizations if bidding as an authorized supplier. Check ATC for any army-specific forms.

What are the technical specifications for the STARTER MOTOR 5-8 KW 24V?

Specifications are not detailed in the summary; bidders should consult the uploaded ATC for exact electrical ratings, waterproofing standards, brush gear assembly, and coil ignition configurations. Ensure compatibility with field windings and inter-bkt bearing bush requirements.

When is the delivery period and how are extensions calculated?

Delivery begins from the order date; extensions follow: (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days. The Purchaser may extend up to the original delivery period during option exercise.

What are the EMD and payment terms for army component tender 2025?

EMD details are specified in the ATC and not visible here. Payment terms will be defined in ATC; bidders must submit EMD along with bid and adhere to payment milestones described in the ATC.

What is the scope of the 25% option clause in the army tender?

The purchaser may increase contracted quantity up to 25% during the currency of the contract at the same rates. Delivery time adjusts based on the option clause using the specified formula; a minimum 30 days applies to extensions.

Which OEM or brand requirements are specified for army procurement 2025?

Brand/OEM requirements are not specified in the summary; bidders should verify in the ATC document uploaded by the buyer for any mandatory brands or approvals.

What documents confirm eligibility for the army winded starter components bid?

Eligibility is established by meeting GST and PAN requirements, providing experience in similar projects, financial stability, and OEM authorizations if applicable. The ATC will list any additional eligibility criteria and submission formats.