Badminton Shuttle Cock (V2) as per IS 415,Badminton Racket,Volleyballs as per IS 417:1986,Volleybal
Indian Army
TINSUKIA, ASSAM
Bid Publish Date
17-Nov-2025, 4:22 pm
Bid End Date
01-Dec-2025, 9:00 am
Bid Opening Date
01-Dec-2025, 9:30 am
Progress
Quantity
6
Bid Type
Two Packet Bid
The Bhakra Beas Management Board (BBMB) invites a supply-only tender for badminton rackets under the 2025 procurement cycle. The opportunity is limited to the supply of goods with no BOQ items published. Key terms include a flexible quantity option up to 25% of bid quantity during contract execution and during the currency, at contracted rates. The delivery start is contingent on order dates, with standard extension provisions and minimum 30-day additional time guidance. This tender requires bidders to align with BBMB’s procurement practices and ensure compliance with the option clause while maintaining delivery discipline.
Product/service: Badminton rackets (supply of goods only)
Quantity/scale: Not disclosed in data; bidders should prepare to meet BBMB’s stated quantity in final tender
Estimated value: Not provided
Standards/Certifications: Not specified; propose ISO 9001 or equivalent if available and ensure product authenticity
Warranty/after-sales: Not specified in data; bidders should verify BBMB expectations in final package
Delivery/Installation: Delivery-only scope; no installation
Brand/OEM: Not specified; provide options with manufacturer credibility and authenticity
Option Clause: BBMB may increase/decrease quantity up to 25% at contracted rates during contract and currency
Delivery Timing: Additional time calculation requires minimum 30 days; starts from last date of original delivery order
Scope: Only supply of badminton rackets; no installation, service, or maintenance included
Pricing: Bid price must cover all cost components for the supply
Documentation: Prepare standard bid submission documents per BBMB norms; OEM authorizations may be required
Compliance: Bidders must adhere to delivery and quantity variation provisions and provide necessary certifications
Purchaser may increase or decrease quantity up to 25% at bid quantity and during currency at contracted rates; delivery extension follows calculated formula with minimum 30 days
Delivery period commences from the last date of the original delivery order; extended period based on (Increased quantity ÷ Original quantity) × Original delivery period
Not specified in data; bidders should await final tender package for payment terms
Demonstrated ability to supply sporting goods, preferably badminton rackets
Compliance with government procurement norms and ability to meet BBMB option clause
Sufficient financial capacity to handle supply commitments (turnover/proof to be provided in final bid)
Indian Army
TINSUKIA, ASSAM
N/a
REWARI, HARYANA
Industrial Training Institute
JHAJJAR, HARYANA
Indian Army
HOSHANGABAD, MADHYA PRADESH
Indian Army
EAST SIKKIM, SIKKIM
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for prior supply of sporting goods (badminton equipment preferred)
Financial statements or turnover proof
EMD/Security deposit documentation (if required in final tender)
Technical bid documentation (brand/model specifications of racket proposed)
OEM authorization or distributor certificate (if branded rackets are offered)
Bidders should prepare standard bid submission documents (GST, PAN, experience certificates, financials) and anticipate an EMD or security deposit. The tender specifies the supply-of-goods scope and a 25% quantity variation option. Ensure OEM authorizations if offering branded rackets and align with the option clause for delivery and pricing.
Submit GST certificate, PAN card, audited financial statements, experience certificates for sporting goods supply, OEM authorization if applicable, and technical details of the racket model proposed. Also provide any standard compliance certificates and bid security as specified in the final tender package.
Delivery periods start from the last date of the original delivery order. If quantity increases, the additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days.
The data does not specify explicit standards. Bidders should offer racket models from reputable manufacturers with authentic warranties and provide any available quality certifications. Clarify in the final tender package whether ISO 9001 or brand-specific certifications are required.
The scope is strictly supply of goods (badminton rackets) with no installation or services. Bidders must ensure flat-rate pricing covers all costs and be prepared for quantity variation up to 25% during contract execution.
Demonstrated capability to supply sporting goods, adherence to BBMB procurement norms, and ability to support 25% quantity adjustments. Provide financial stability evidence and prior experience in similar supply contracts; OEM authorization may be required for branded rackets.
Pricing must include all cost components for the supply. The bid will consider rate competitiveness, supplier credibility, ability to meet 25% quantity variation, and alignment with the delivery extension terms as specified in the option clause.
Kendriya Vidyalaya Sangathan
📍 LATEHAR, JHARKHAND
Access all tender documents at no cost
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS