Toner Cartridges / Ink Cartridges / Consumables for Printers,Toner Cartridges / Ink Cartridges / Co
Office Of Dg (ace)
PUNE, MAHARASHTRA
Bid Publish Date
21-Nov-2025, 12:35 pm
Bid End Date
02-Dec-2025, 2:00 pm
Bid Opening Date
02-Dec-2025, 2:30 pm
EMD
₹29,529
Progress
Quantity
165
Category
Toner Cartridges / Ink Cartridges / Consumables for Printers
Bid Type
Single Packet Bid
Indian Air Force invites bids for toner cartridges / ink cartridges / consumables for printers under a government procurement process. The project scope covers generic cartridge classes, compatible printer models, and replacement consumables. The tender lists an EMD of ₹29,529 and allows EMD submission via Fixed Deposit Receipt (FDR) or standard formats, with potential PBG/Performance Security options. Unique terms include a Manufacturer Authorization requirement for authorized distributors and a Non-Disclosure Declaration to protect contract details. No BOQ items are published, signaling a broad, brand-agnostic supply opportunity with emphasis on OEM authorization and compliance.
Location details are not specified in the data, but the procurement is conducted by the Indian Air Force, reflecting a centralized government tender framework. The bid terms emphasize secure bid submission, verification of financial health, and post-award documentation. The opportunity targets suppliers capable of providing generic cartridge categories that fit a range of printers and multifunction devices, with emphasis on compliance and traceability. A notable differentiator is the emphasis on EMD via FDR and mandatory NDA, which reduces leakage of technical information and secures the bidding process.
EMD: ₹29,529; FDR option allowed with pledge conditions
OEM authorization required for authorized distributors
Non-disclosure declaration mandatory; breach leads to legal action
Performance security may be required as PBG or FDR
Bidder financial health verification; avoid liquidation or bankruptcy
Not explicitly stated; EMD required; potential PBG/FDR for performance security; submission timelines for hard copies within 15 days of award.
Delivery timelines not specified; bidders must align with Government procurement processes; ensure documentation readiness for post-award deliverables.
Not specified in data; typical government tenders may apply LD for delays; bidders should prepare for potential penalties via standard contract terms.
No liquidation, court receivership, or bankruptcy proceedings
Must provide Manufacturer Authorization if bidding through an authorized distributor
Submit Non-Disclosure Declaration and EMD/FDR as specified
Office Of Dg (ace)
PUNE, MAHARASHTRA
Centre For Development Of Advanced Computing (c-dac)
PUNE, MAHARASHTRA
Office Of Dg R & D (r & M)
CHANDIGARH, CHANDIGARH
Indian Air Force
VADODARA, GUJARAT
Gliders India Limited
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| GENERIC | Product Class of Cartridge | OEM |
| GENERIC | Printer/Multifunction Machines Brand for which offered Cartridge/Consumable is Suitable | HP |
| GENERIC | Type of Cartridge/Consumable | Ink Cartridge |
| GENERIC | Color of the Ink/Toner | Magenta |
| GENERIC | Model Number of OEM's Printer/OEM's Multi Function Machine | HP Designjet T7200 |
| GENERIC | Model Number of OEM's Printer Cartridge/Consumable | HP 761 400ml Magenta Designjet Ink Cartridge-CM993A |
| GENERIC | Minimum Yield of the Replacement Cartridge/Consumable offered (Number of Pages) | 501 to 1000, 1001 to 2000, 2001 to 5000, 5001 to 10000, 10001 to 15000, 15001 to 20000, 20001 to 30000, 30001 to 40000, 40001 to 50000, 50001 to 70000, 70001 to 100000, 100001 to 500000, 500001 to 1000000, 1000001 to 1500000 Or higher |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates (similar toner/ink cartridge supply)
Financial statements / annual turnover evidence
EMD submission document or FDR (as allowed)
Manufacturer Authorization from OEM (for authorized distributors)
Non-Disclosure Declaration certificate on bidder letterhead
Technical bid documents and any OEM authorizations
Delivery/PO address and contact details
Bidders must submit EMD ₹29,529, provide Manufacturer Authorization if sourcing through an OEM, and upload a Non-Disclosure Declaration. Include GST, PAN, experience certificates, financial statements, and technical bid documents. FDR is acceptable for EMD; ensure hardcopy delivery within 15 days of award.
Required documents include GST certificate, PAN, experience certificates for toner supply, financial statements, EMD submission (or FDR), OEM authorization (if applicable), NDA on bidder letterhead, and technical bid documents. Ensure scanned copies uploaded and hard copies delivered per ATC terms.
EMD is ₹29,529. EMD can be submitted via standard format or Fixed Deposit Receipt (FDR) pledged to the ac eligible buyer. Post-award, performance security may be demanded as PBG or FDR, with original FDR delivered within 15 days of award.
If bidding through an Authorized Distributor, provide Manufacturer Authorization with distributor name, designation, address, email, and phone. This confirms supply capability for compatible toner/ink cartridges across the specified printer models.
The data does not specify exact delivery dates. Bidders should prepare to meet government procurement timelines and ensure readiness for post-award documentation, with potential delivery milestones aligned to contract terms and LD risk not explicitly defined.
NDA requires bidders to declare non-disclosure of contract details, specifications, and patterns. The declaration must be on bidder letterhead with authorized signatories. Breach may lead to legal action; ensure confidentiality clauses cover all contract phases.
Confirm compatibility with the generic cartridge category by matching printer model numbers to OEM specifications. Provide clear mapping in the bid, including minimum yield claims and color specifications when available, while ensuring OEM alignment where required.
Though LD details are not specified here, government tenders often include liquidated damages for late delivery. Bidders should predefine milestone-based delivery plans and ensure robust supply chain contingencies in the bid to minimize risk of penalties.
Central Coalfields Limited
📍 HAZARIBAG, JHARKHAND
Indian Army
📍 INDORE, MADHYA PRADESH
Indian Army
📍 INDORE, MADHYA PRADESH
South East Central Railway
📍 BILASPUR, CHHATTISGARH
Indian Army
📍 DARJEELING, WEST BENGAL
Access all tender documents at no cost
Main Document
OTHER
CATALOG Specification
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
OTHER
CATALOG Specification
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS