V - Belts - Endless V - Belt for Industrial Purposes as per IS 2494,V - Belts - Endless V - Belt fo
Indian Army
Menu
Progress
Quantity
20
Bid Type
Two Packet Bid
The procurement entity is Bokaro Power Supply Company Private Limited (Thermal Power division) seeking supply of V BELT for Silo Air Compressor of CPP Boilers in BOKARO, JHARKHAND. The BOQ shows no items listed, and the estimated value is not disclosed. A key consideration is the dynamic quantity clause allowing ±25% fluctuations at contract award and during the contract term, with delivery timelines tied to the original delivery period and extended periods. Firms should prepare for a flexible order quantity and ensure readiness to align with the purchaser’s extended delivery windows. The tender emphasizes risk-sharing around delivery windows and quantity adjustments, hinting at a potentially high-volume, supplier-flexible procurement. A strong advantage is understanding the specific belt category and its critical role in CPP boiler silo air systems, which informs stocking and delivery planning for bidders.
Product/service names and categories: V BELT for Silo Air Compressor of CPP Boilers
Quantities: ±25% quantity flexibility as per option clause
Estimated value: Not disclosed
Experience requirements: Prior supply of belts or similar components to CPP/industrial boilers recommended
Quality/standards: Review ATC for any standard or certification requirements
Option clause allows ±25% quantity change at bid/contract time
Delivery period starts from last date of original order with minimum 30 days for extended period
ATC document attached; bidders must comply with ATC provisions and any special clauses
Payment terms not specified in data; bidder should consult ATC for advance, milestone, or COD terms
Delivery period begins from last date of original delivery order; extended time based on increased quantity as per formula
Penalty details not provided in available data; review ATC for LD provisions
Experience in supplying belts or industrial components for CPP/boiler systems
GST registration and valid PAN
Financial capacity to handle short-term variations in orders
Compliance with ATC and attached documentation
Indian Army
South Western Railway
Bharat Heavy Electricals Limited (bhel)
JHANSI, UTTAR PRADESH
Ntpc Sail Power Company Ltd
SUNDERGARH, ODISHA
Bhakra Beas Management Board
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar belt supply to CPP/industrial boilers
Financial statements (last 2-3 years)
EMD/Security deposit submission proof (as per ATC)
Technical bid document
OEM authorization/authorized distributor certificate (if applicable)
Any specific technical compliance certificates requested in ATC
Key insights about JHARKHAND tender market
Bidders must submit GST, PAN, experience certificates, financial statements, and EMD as per ATC. Ensure OEM authorization if required, and review the attached ATC for delivery and quantity adjustment terms. Confirm belt compatibility with silo air compressor models used in CPP boilers and respond to the 25% quantity option in the bid.
Prepare GST certificate, PAN, 2-3 years of financials, experience certificates for similar belt supply, EMD proof, technical bid, and OEM authorization. Include any specific belt standards or model numbers if provided in ATC, and ensure compliance with delivery terms and flexibility clause.
Delivery starts from the last date of the original delivery order; extended delivery may apply if quantity increases. Additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. Review ATC for any exceptions or penalties.
The tender data does not specify standards; bidders should verify ATC for any required certifications. Prepare belt standards alignment with typical CPP boiler components and be ready to demonstrate belt compatibility with silo air compressors used in Jharkhand power plants.
EMD amount is not disclosed in the current tender data. Bidders should check the attached ATC document or contact the procuring authority to confirm the exact EMD value and submission method before bid submission.
The purchaser may adjust quantity by ±25% at award and during the contract term. Plan inventory to accommodate potential increases/decreases and align delivery schedules with the extended delivery period criteria specified in the ATC.
The ATC document is uploaded and linked in the tender portal under Buyer Added Bid Specific ATC. Bidders must click the ATC link, review terms, and ensure all conditional clauses are reflected in the technical bid and financial bid.
Sign up now to access all documents
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Choose from flexible plans to access tender documents instantly
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS