Custom Bid for Services - Rebuilding of 2 number Shovel Bucket for 182M Electric Rope Shovel
Nmdc Limited
DANTEWADA, CHHATTISGARH
Menu
Bid Publish Date
12-Dec-2025, 5:46 pm
Bid End Date
25-Dec-2025, 6:00 pm
Value
₹34,398
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
BEML Limited invites GeM bids for the repair of 01 no. Boom point Sheave of a 10Cu.M AC Rope Shovel under MARC at NCL Nigahi Project, Singrauli, MP. Process is two-bid (Technical and Commercial) on the GeM platform. Experience criterion requires bidders to have prior experience in line boring major sub-assemblies (preferably not less than 3 years). The tender emphasizes online submission via GeM and specifies a closing date of 25.12.2025 18:00. The work is location-bound within the MARC project scope and is issued by BEML Limited (Govt. of India). Bidder assistance is through the GeM portal only, with inquiries routed there.
Repair scope: 01 no. Boom point Sheave
Equipment: 10 Cu.M AC Rope Shovel
Project: MARC at NCL Nigahi Project, Singrauli, MP
Procurement mode: GeM two-bid system (Technical and Commercial)
Experience: line boring major sub-assemblies; min 3 years preferred
Key contractual clauses: quantity/duration up to 25% adjustment; excess settlement with documentation
Two-bid submission on GeM portal (Technical + Commercial).
Experience requirement of at least 3 years in line boring of major sub-assemblies.
Quantity/duration adjustment up to 25% and excess settlement with documentation.
Not specified in the tender data; verify on GeM and in official communications; prepare to align with standard GeM terms.
Not specified in the tender data; bidders should obtain exact timelines via GeM portal clarification.
Not explicitly detailed; monitor GeM notices for any LD or penalties related to schedule or quality.
Minimum 3 years line boring experience on major HEMMs (preferred).
Registration and bid submission via GeM platform (two-bid system).
Ability to meet MARC project repair scope for 01 no boom point sheave on a 10Cu.M rope shovel.
Nmdc Limited
DANTEWADA, CHHATTISGARH
Power Grid Corporation Of India Limited
Nmdc Limited
DANTEWADA, CHHATTISGARH
Bharat Earth Movers Limited (beml)
SIDHI, MADHYA PRADESH
Indian Army
KACHCHH, GUJARAT
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST Registration Certificate
Permanent Account Number (PAN) card
Experience certificates demonstrating line boring of major sub-assemblies (minimum 3 years preferred)
Financial statements / turnover evidence
EMD/Security deposit details (if applicable on GeM)
Technical bid document (compliance against scope of work)
OEM authorizations or dealer/stockist credentials (if required by terms)
Key insights about MADHYA PRADESH tender market
Bidders must register on the GeM portal, submit both Technical and Commercial bids online, and ensure compliance with the scope: repair of 01 boom point sheave for a 10Cu.M AC Rope Shovel under MARC at NCL Nigahi. Ensure 3+ years line boring experience and follow the 25% quantity/duration flexibility terms. Clarifications via GeM.
Submit GST, PAN, experience certificates showing line boring of major sub-assemblies (3+ years preferred), financial statements, technical bid, and any OEM authorizations if requested. Bids must be on GeM portal; ensure EMD/security as applicable and verification of terms on the portal.
The tender data specifies line boring capability and MARC scope but does not list explicit IS or ISO standards. Bidder should verify on GeM for any required OEM approvals, along with compliance to MARC/NCL project guidelines and quality assurances during repair.
The tender closing date is 25.12.2025 18:00. Bidders must complete both technical and commercial bids on GeM before this deadline and respond to any portal clarifications promptly to avoid bid rejection.
Bidders should have prior experience in line boring major sub-assemblies, with a preferred minimum of 3 years. This experience helps demonstrate capability to handle the boom point sheave repair on a 10Cu.M rope shovel under MARC at NCL Nigahi.
The contract includes an option clause allowing up to 25% increase in quantity or duration at the time of contract issue, with a final limit of 25% post-issuance. Vendors must accept revised quantities/durations and may claim excess charges with supporting documents.
Bids must be submitted exclusively on the GeM platform, with both technical and commercial bids uploaded. Register on GeM, follow the portal’s instructions, and use the provided contact channel on GeM for any clarifications or queries related to the repair scope.
No BOQ items are listed in the current tender data. Bidders should rely on the stated scope—repair of 01 boom point sheave for a 10Cu.M rope shovel—and seek clarification via the GeM portal for any sub-assembly parts or ancillary services required.
Sign up now to access all documents
Main Document
OTHER
OTHER
SCOPE_OF_WORK
PAYMENT
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Choose from flexible plans to access tender documents instantly
Main Document
OTHER
OTHER
SCOPE_OF_WORK
PAYMENT
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS