Custom Bid for Services - TOTAL AMOUNT INCLUDING ALL CHARGES AND GST FOR MONTHLY FIXED CHARGE OF 22
Gail India Limited
AURAIYA, UTTAR PRADESH
Menu
Bid Publish Date
13-Dec-2025, 12:15 pm
Bid End Date
05-Jan-2026, 3:00 pm
Location
Progress
Quantity
2
Bid Type
Two Packet Bid
Konkan LNG Limited invites bids for outsourced services to perform servicing, repair, calibration, verification and stamping of weights totaling 75 MT and for the weighbridge capacity of 60 MT with 2 nos. Bidders must quote lumpsum charges per service line item (including GST) as per the SOR/SOW. The ATC requires a 5% Performance Bank Guarantee on order value. This procurement targets a compliant service provider capable of precise calibration, stamping and verification in line with the tender’s SOW, with adherence to all portal terms. The tender emphasizes alignment with the ATC precedence if conflicts arise and mandates strict adherence to GEM ITB/Tender documents. No BOQ items were published, so quotes must be comprehensive across all service lines.
Total weights to service: 75 MT
Weighbridge capacity: 60 MT per unit
Number of weighbridge units: 2
Quotation basis: Lumpsum per service line item (GST included)
Guarantee: 5% of order value as Performance Bank Guarantee
ATC/SOW/SOR precedence for scope and evaluation
PBG of 5% of order value is mandatory for successful bidders
Lumpsum quotes must be GST-inclusive for each service line
ATC document governs any conflict with GEM ITB/Tender terms
5% PBG; GST-inclusive lumpsum payments; terms aligned with SAP PO/LOA once awarded
Delivery/verification window as per SOW; exact timelines to be defined in SAP PO/LOA
Penalties, if any, to be defined in SOW; SLA/LLD terms per ATC and PO
Experience in servicing, calibration, verification and stamping of weights or weighbridges
GST registration and financial stability documentation
Ability to provide PBG to 5% of order value; compliance with ATC/SOW/SOR
Gail India Limited
AURAIYA, UTTAR PRADESH
Hindustan Petroleum Corporation Ltd
JHAJJAR, HARYANA
Hindustan Petroleum Corporation Ltd
JHAJJAR, HARYANA
Gail Gas Limited
Moil Limited
Tender Results
Loading results...
Discover companies most likely to bid on this tender
- GST registration certificate
- PAN card
- Experience certificates for similar weight calibrations/verification
- Financial statements (as required by ATC)
- EMD/Security documents or details (as per ATC)
- Technical bid submission documents conforming to SOW/SOR
- OEM authorization or service partner certificates (if applicable)
Key insights about MAHARASHTRA tender market
Bidders must submit GST, PAN, experience certificates, financial statements, EMD/guarantee, and technical bid formats per ATC. Ensure compliance with SOW/SOR and provide lumpsum quotes including GST for each service line. A 5% PBG is required on order value after award.
Required documents include GST certificate, PAN card, experience certificates for similar calibration work, financial statements, EMD documentation, OEM authorizations if applicable, and all forms filled, signed, and stamped per ATC. Non-compliance leads to rejection per evaluation criteria.
Tender specifies servicing, repair, calibration, verification, and stamping for total 75 MT weights; 60 MT weighbridge capacity per unit with 2 units. Quotes must be lumpsum per service line; GST included. Precise standards are defined in SOW/SOR and ATC; follow those documents for compliance.
Payment terms align to SAP PO/LOA terms after award; the tender specifies a 5% PBG of order value and lumpsum payments including GST. Exact payment milestones will be defined in the SAP PO/LOA contract.
A Performance Bank Guarantee (PBG) of 5% of the order value is mandatory. The PBG must follow Format F-5 as specified in ITB/tender documents and will be invoked for non-performance as per SOW and SLA.
Scope includes servicing, repair, calibration, verification, and stamping of weighbridges with a capacity of 60 MT per unit and total 2 units. Quoted charges must cover the complete line items; any deviations require explicit approval per ATC/SOW.
ATC provisions prevail over GEM ITB terms. Bidders must follow ATC documented criteria for bid evaluation and submission formats. Any ambiguity should be resolved in favor of ATC, as specified in the buyer-added ATC section.
The tender mandates compliance with SOW/SOR and ATC; OEM authorizations may be required for specific equipment. While specific ISO/IS standards aren’t listed in data, ensure calibration procedures meet standard industry practices and vendor-specific quality controls per ATC.
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
SCOPE_OF_WORK
PAYMENT
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Choose from flexible plans to access tender documents instantly
Main Document
OTHER
OTHER
OTHER
SCOPE_OF_WORK
PAYMENT
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS