Dewatering Pumps as per IS 10001,Dewatering Pumps as per IS 10001
Urban Development And Housing Department
SARAN, BIHAR
Menu
Bid Publish Date
10-Dec-2025, 11:59 am
Bid End Date
20-Dec-2025, 12:00 pm
Location
Progress
Quantity
2
Bid Type
Two Packet Bid
The procurement is for a submersible dewatering pump, 1500 RPM under the Iisco Steel Plant (Steel Authority of India Limited) umbrella. No BOQ value or item count is listed, but the buyer mandates delivery within 30 days for one set and 45 days for remaining quantity post-PO. The tender requires the product datasheet and performance curve with the quote, plus operation manuals, electrical drawings, and test certificates. Installation supervision is the vendor’s responsibility, and ISP will conduct pre-acceptance inspection. GST handling is specified; invoices must be GST-compliant and issued in the consignee’s name with GSTIN. The ATC emphasizes OEM authorization for authorized distributors, and GST payment proof must accompany GST invoices. This tender targets suppliers with pump datasheets, performance curves, and on-site installation capability in ISP stores. This is a single-pump category under submersible dewatering pumps, with emphasis on datasheets, warranty, and post-delivery service.
Submersible dewatering pump, 1500 RPM
Delivery: 1 set within 30 days; balance within 45 days
Datasheet with performance curve required
Operation manual and GA drawings required
Electrical drawings of control panel required
Test certificate required
OEM authorization for authorized distributors
GST impact: bidders bear GST; reimbursement as actuals or lower quoted rate
Provide PAN, GSTIN, cancelled cheque, EFT mandate for vendor code creation
OEM authorization required for non-OEM bidders
Invoice in consignee name with GSTIN; upload GST payment proof
Delivery: 30 days for first set; 45 days for rest; ISP inspection after receipt
Installation supervision included at no extra cost
GST handling and reimbursement rules; invoicing to consignee with GSTIN; GST payment proof uploaded on GeM
Delivery of 1 set within 30 days; remaining quantity within 45 days from PO
Not specified in ATC; ensure delivery milestones are met to avoid potential penalties
Experience in supplying submersible dewatering pumps with performance data
Authorization from OEM for distributors, if not direct OEM bidder
GST registration and financial stability documentation
Urban Development And Housing Department
SARAN, BIHAR
Urban Development And Housing Department
KAIMUR (BHABUA), BIHAR
N/a
KORIYA, CHHATTISGARH
Ntpc Limited
REWA, MADHYA PRADESH
South East Central Railway
DURG, CHHATTISGARH
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST certificate
PAN card
Cancelled cheque
EFT mandate certified by bank
OEM authorization or Manufacturer Authorization
Product datasheet with performance curve
Operation manual
GA drawings (pump) and electrical drawings of control panel
Test certificate
GST invoice copy and GST payment screenshot
Key insights about WEST BENGAL tender market
Bidders must submit GSTIN, PAN, cancelled cheque, EFT mandate, and OEM authorization if not direct OEM. Include product datasheet, performance curve, operation manual, GA drawings, electrical drawings, and test certificates. Ensure GST invoices reflect consignee name and GSTIN; upload GST payment proof on GeM.
Required documents include PAN, GSTIN, cancelled cheque, EFT mandate, OEM authorization, and technical documents: product datasheet with performance curve, operation manual, GA drawings, electrical drawings, and test certificates. GST invoice in consignee name with GSTIN is mandatory.
Delivery must be completed with one set within 30 days of PO placement and the balance quantity within 45 days. Installation supervision is included at no extra cost, and ISP inspection occurs after material receipt.
OEM authorization is required for distributors; ensure the datasheet includes performance curves. While explicit standards aren’t listed, provide ISO-like documentation and test certificates accompanying the supply; GST invoicing must align with GST norms.
GST is borne by the bidder; reimbursement follows actuals or the quoted rate, whichever is lower, capped to the quoted GST percentage. Invoice must be GST-compliant and issued in the consignee’s name with GSTIN; upload GST payment screenshot.
Installation supervision is provided by the bidder at no extra cost; ISP will conduct post-delivery inspection. Ensure you provision manuals, GA drawings, and control panel electrical drawings to facilitate on-site setup.
Eligibility requires relevant experience in supplying dewatering pumps with performance data, GST and PAN validity, and OEM authorization if applicable. Ensure the capability to provide on-site installation support and post-delivery documentation per ATC.
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Choose from flexible plans to access tender documents instantly
Main Document
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS