GEM

Indian Army ISO 9001 Bid Procurement 2025 for Security Equipment - 25% Quantity Option

Bid Publish Date

19-Nov-2025, 2:12 pm

Bid End Date

29-Nov-2025, 3:00 pm

Bid Opening Date

29-Nov-2025, 3:30 pm

Progress

Issue19-Nov-2025, 2:12 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

51

Category

Title1

Bid Type

Two Packet Bid

Key Highlights

  • ISO 9001 certification mandatory for bidder or OEM
  • Up to 25% quantity variation during contract and currency
  • Eight BOQ items with no listed quantities; anticipate scope
  • Vendor Code Creation documents required: PAN, GSTIN, Cancelled Cheque, EFT Mandate
  • ATC/Corrigendum may introduce additional certificates or terms
  • Delivery period rules include 30-day minimum extension when applicable

Categories 8

Tender Overview

The tender is issued by the Indian Army under the Department Of Military Affairs for a security equipment procurement package. The contract contemplates 8 BOQ items with unclear item-level details and no listed quantities. A key qualifying requirement is ISO 9001 certification for the bidder or OEM. The procurement includes an option clause allowing up to 25% quantity variation during both initial and extended delivery periods. Bidders must prepare Vendor Code Creation documents: PAN Card, GSTIN, Cancelled Cheque, EFT Mandate. The scope emphasizes compliance with the purchaser’s delivery timelines and potential quantity flexibilities, affecting planning for supply chain readiness and contingency stock management. The tender’s unique aspects include the flexible quantity clause and mandatory ISO 9001 certification for eligibility, with an emphasis on pre-bid documentation discipline.

Technical Specifications & Requirements

  • Standards: ISO 9001 certification for bidder or OEM.
  • Option Clause: Up to 25% increase/decrease in bid quantity at contract placement and during the currency of the contract.
  • Delivery Considerations: Delivery period starts from the last date of the original delivery order; extended periods derive from the formula: (Additional quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
  • Documents: Mandatory uploads include PAN Card, GSTIN, Cancelled Cheque, and EFT Mandate certified by the bank.
  • ATC/ATC Compliance: Additional terms and certificates may be required as per the ATC/Corrigendum.
  • Quality/Certification: ISO 9001 compliance is non-negotiable; lack of required certificates results in rejection.
  • Item Details: Eight BOQ items with no specified quantities; bidders must anticipate scope from the tender and prepare accordingly.

Terms, Conditions & Eligibility

  • EMD/Performance: No explicit EMD amount stated here; bidders must verify in the ATC and bid document.
  • Experience/Turnover: ISO 9001 certification required; OEM-backed compliance strengthens eligibility.
  • Delivery: Delivery timelines tied to the original and extended delivery periods with the 30-day minimum on extensions.
  • Documents: Submit PAN, GSTIN, Cancelled Cheque, EFT Mandate; ensure bank verification for EFT.
  • Clause Compliance: Bidders must comply with option clause terms and any ATC updates; non-compliance risks rejection.
  • Warranty/Penalties: Not explicitly stated; penalties or LD provisions may be defined in the ATC.

Key Specifications

  • Eight BOQ items mentioned; explicit item specifications not provided

  • ISO 9001 certification required for eligibility

  • Delivery periods and extension formula with minimum 30 days

  • Option clause permits ±25% quantity change

  • Mandatory vendor documentation: PAN, GSTIN, Cancelled Cheque, EFT Mandate

Terms & Conditions

  • 25% quantity variation rights during contract execution

  • ISO 9001 certification mandatory for bidders or OEM

  • Mandatory vendor documentation including EFT mandate and GSTIN

Important Clauses

Payment Terms

EMD amount not stated; verify in ATC. EFT mandate required for vendor code creation

Delivery Schedule

Delivery starts from last date of original delivery order; extension time = (additional/original quantity) × original delivery period with a 30-day minimum

Penalties/Liquidated Damages

Details not provided; check ATC for LD terms or penalties related to delays or non-compliance

Bidder Eligibility

  • Must hold ISO 9001 certification, bidder or OEM

  • Must submit PAN, GSTIN, Cancelled Cheque, EFT Mandate

  • Compliance with option clause allowing 25% quantity variation

Past Similar Tenders (Historical Results)

5 found

Title1,Title2,Title3,Title4,Title5,Title6,Title7,Title8

N/a

BANGALORE, KARNATAKA

Posted: 9 October 2025
Closed: 24 October 2025
GEM

Title1,Title2,Title3,Title4,Title5,Title6,Title7,Title8

Survey Of India

KOLKATA, WEST BENGAL

Posted: 14 January 2025
Closed: 4 February 2025
GEM

Title1,Title2,Title3,Title4,Title5,Title6,Title7,Title8

Archaeological Survey Of India (asi)

BELLARY, KARNATAKA

Posted: 31 July 2025
Closed: 22 August 2025
GEM

Title1,Title2,Title3,Title4,Title5,Title6,Title7,Title8

Western Railway

RATLAM, MADHYA PRADESH

Posted: 21 May 2025
Closed: 11 June 2025
GEM

Title1,Title2,Title3,Title4,Title5,Title6,Title7,Title8

West Central Railway

BHOPAL, MADHYA PRADESH

Posted: 21 January 2025
Closed: 11 February 2025
GEM

Bill of Quantities (BOQ) 8 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 Title1 Washing Machine Semi Auto 10.5Kg 4 nos [email protected] 30
2 Title2 Heavy Duty Dryer 1 nos [email protected] 30
3 Title3 Heavy Plate Stand Steel 1 nos [email protected] 30
4 Title4 Stainless Steel Electric Chapati Warmer 1 nos [email protected] 30
5 Title5 Keresone Hamam 2 nos [email protected] 30
6 Title6 Digital Weighing Machine 1 nos [email protected] 30
7 Title7 15 KVA Generator 1 nos [email protected] 30
8 Title8 Mattress 40 nos [email protected] 30

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled Cheque copy

4

EFT Mandate copy certified by bank

5

ISO 9001 certification ( bidder or OEM )

6

Any ATC/ Corrigendum attachments

7

Vendor Code Creation documents as specified

Frequently Asked Questions

Key insights about UTTARAKHAND tender market

How to bid in Indian Army security equipment tender 2025 India

Bidders must ensure ISO 9001 certification for themselves or their OEM, submit PAN, GSTIN, Cancelled Cheque, and EFT Mandate with the bid, and comply with the 25% quantity variation option. Review ATC for any additional certificates and BOQ item details before submission.

What documents are required for vendor code creation in this tender

Submit PAN Card, GSTIN, Cancelled Cheque, and an EFT Mandate certified by the bank. Ensure these documents are clear and legible and align with the organization’s vendor onboarding process to avoid bid rejection.

What is the impact of the 25% quantity variation clause

The purchaser may increase or decrease the quantity by up to 25% at contract placement and during the contract currency at contracted rates. Delivery timelines adjust proportionally, with a minimum extension of 30 days if original delivery is shorter.

Which standard is mandatory for eligibility in this Indian Army tender

Eligibility requires ISO 9001 certification for either the bidder or the OEM. Non-compliance leads to bid rejection. Verify the ISI or other standards only if specified in ATC, but ISO 9001 is mandatory here.

When do delivery periods commence for this procurement

Delivery begins from the last date of the original delivery order. If an extended period is invoked, additional time equals (Increase quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.

What are the primary submission requirements for this tender

Submit PAN, GSTIN, Cancelled Cheque, EFT Mandate, and ensure ISO 9001 certification. Also upload any ATC documents and certificates requested in the Corrigendum. Ensure BOQ alignment even when item quantities are not specified.

What is the significance of the ATC in this tender

ATC outlines additional terms, required certificates, and any OEM authorizations. It may mandate further compliance and documents beyond the base bid. Bidders should review and attach all ATC-specified certifications to avoid disqualification.

What indicates a successful bid submission for this procurement

A successful submission includes complete vendor onboarding documents, ISO 9001 compliance proof, and all ATC attachments. The bid must reflect readiness for a possible 25% quantity variation and a compliant delivery schedule following the original and extended periods.