Organization: Aligarh Muslim University (AMU) — Department Of Higher Education. Project: Internal electrification for a toilet on the First Floor of Osmania Hostel, Sir Syed Hall (North) within the AMU campus. Location: Aligarh, Uttar Pradesh. Scope is construction-electrical in nature with a flexible quantity clause allowing up to 25% increase during contracting and an option-driven delivery timeline. The tender references an ATC and a no-BOQ-item setup, indicating a compact scope with emphasis on compliance and delivery scheduling rather than a large enumerated bill of quantities. The supplier must align with the option clause and ensure timely execution under contract extensions when triggered.
Technical Specifications & Requirements
- Option Clause: Purchaser may increase or decrease quantity up to 25% of bid quantity at contract placement and during currency at contracted rates.
- Delivery Period Rule: Delivery starts from the last date of the original delivery order; extended time for additional quantity is calculated as (Additional quantity ÷ Original quantity) × Original delivery period (days), with a minimum of 30 days.
- If original delivery period is under 30 days, the added time equals the original period. Purchaser may extend duration up to the original delivery period when exercising the option clause.
- Documentation: ATC document uploaded; no explicit BOQ items. Emphasis on compliance, delivery readiness, and change-order handling.
- Scope Context: Small-scale internal electrification works for a hostel toilet, scenario-based procurement rather than mass equipment supply.
Terms, Conditions & Eligibility
- Quantity Flexibility: Up to 25% variation in bid quantity (increase/decrease).
- Delivery Timing: Calculations anchored to the original delivery period with a minimum of 30 days; extensions possible within the contracted framework.
- ATC/Documentation: Access to Buyer Added ATC document; adhere to terms therein.
- BoQ: No items listed in BoQ; bidders should prepare for scope interpretation and site-specific requirements.
- Compliance: Bidders must comply with the option clause and associated delivery logic; explicit EMD/turnover requirements are not specified in the available data.