Trial run of Operation maintenance of distribution system (CI/DI/HDPE/ UPVC pipe) of Kaliyug Biswanathpur Surface Based W/S Scheme under Deganga block within the jurisdiction of North 24 Pgs W/S Division I, P.H.E. Dte. for 180 Days.
PHE
📍 24 PARAGANAS NORTH, WEST BENGAL