Custom Bid for Services - LPG BOTTLING PLANT, TANK LORRY OPERATION AND SUPPORT SERVICES AT BPCL-MUM
Bharat Petroleum Corporation Ltd
MUMBAI, MAHARASHTRA
Menu
Bid Publish Date
13-Dec-2025, 2:00 pm
Bid End Date
12-Jan-2026, 3:00 pm
EMD
₹3,16,800
Location
Progress
Quantity
3600000
Bid Type
Two Packet Bid
Organization: Western Coalfields Limited (Coal India Limited umbrella) seeks an operator for the Bottling Plant O&M on a Revenue Share Basis in Nagpur, Maharashtra. Scope covers packaging for 250 ml, 500 ml, and 1000 ml bottles with revenue-sharing economics. EMD is ₹316,800. Location: Nagpur, Maharashtra 440001. The contract emphasizes uniform PO shares across all bottle sizes (250 ml, 500 ml, 1000 ml) with a maximum PO share of 96.00%. No start/end dates or BOQ items are listed, signaling a streamlined, single-bid evaluation window for qualified bidders. The arrangement targets packaged drinking water, packaged natural mineral water, and RO plant operations under WCL governance, reflecting a clean, revenue-driven O&M model.
O&M of bottling plant on revenue share basis for multiple bottle capacities
Capacities: 250 ml, 500 ml, 1000 ml
Product categories: Packaged Drinking Water, Packaged Natural Mineral Water, RO plant
EMD: ₹316,800
PO share: uniform across all capacities; maximum 96.00%
Uniform Plant Operator (PO) share across 250 ml, 500 ml, 1000 ml
Maximum PO share cannot exceed 96.00%
Submit all required certificates; non-submission may lead to rejection
Revenue share model with specified PO share; excess charges allowed up to a defined percentage; invoices must include supporting documents for any excess settlement
No explicit delivery timeline provided in data; bidders must align with ATC delivery expectations per terms and conditions
Not explicitly detailed in provided data; ATC may include LD provisions; ensure compliance to avoid penalties
Registered entity with GST and PAN
Experience in operating bottling/water packaging facilities
Financial stability evidenced by latest financial statements
Bharat Petroleum Corporation Ltd
MUMBAI, MAHARASHTRA
Indian Oil Corporation Limited
ERNAKULAM, KERALA
Hindustan Petroleum Corporation Ltd
PALAKKAD, KERALA
N/a
CHANDRAPUR, MAHARASHTRA
Marketing Division
JALANDHAR, PUNJAB
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST certificate
PAN card
Experience certificates
Financial statements
EMD submission document
Technical bid documents
OEM authorizations (if applicable)
Key insights about MAHARASHTRA tender market
Bidders must submit GST and PAN, experience certificates, financial statements, and EMD of ₹316,800. Ensure a uniform Plant Operator (PO) share across 250 ml, 500 ml, and 1000 ml categories, not exceeding 96.00%. Include all ATC-compliant certificates; follow the bidder submission checklist in terms.
Required documents include GST certificate, PAN, experience certificates, financial statements, EMD documents, technical bid, and OEM authorizations if applicable. Submit all certificates demanded in the ATC; missing documents lead to rejection per terms.
The EMD amount is ₹316,800. Submit via bank transfer or online as specified in the tender’s terms; ensure the instrument matches the bidder’s registered name and project category for the Nagpur facility.
Bid units must quote the same PO share percentage for 250 ml, 500 ml, and 1000 ml categories. The share must not exceed 96.00%; any deviation renders the bid non-responsive per ATC guidelines.
The scope includes Packaged Drinking Water, Packaged Natural Mineral Water, and RO plant operations at Patansaongi Nagpur Area WCL. The contract awards on a revenue-share basis with specified PO constraints.
Bidders must upload required certificates listed in the ATC, including GST, PAN, experience certifications, and technical compliance documents. Compliance per ATC is mandatory; non-compliance risks rejection.
The provided data does not specify a delivery timeline; bidders should align with ATC delivery expectations and negotiate feasible schedules within terms and shop-floor readiness for the Nagpur bottling facility.
Payments are governed by the revenue-share arrangement under the O&M model; exact percentages are locked to the uniform PO share and invoicing per excess-settlement provisions. Ensure invoices include required supporting documents to avoid delays.
Sign up now to access all documents
Main Document
OTHER
SCOPE_OF_WORK
OTHER
ATC
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Choose from flexible plans to access tender documents instantly
Main Document
OTHER
SCOPE_OF_WORK
OTHER
ATC
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS