Tender Overview
Southern Railway invites bids for XLPE cable procurement for working voltages up to and including 1.1 KV, conforming to IS 7098 (Part 1) with ISI/BIS certification. Estimated contract value is ₹4,499,750, with an EMD of ₹89,995. The tender emphasizes ISI marked products and OEM/bidder authorization, requiring BIS certificates and OEM documentation. The scope includes cables suitable for mining environments and low-temperature operation, with designation of conductor material, inner sheath, armour type, and performance attributes. The buyer reserves a 25% quantity variation up or down, up to during contract execution, with delivery timelines adjusted accordingly. The tender highlights the need for credentials demonstrating prior similar-item supply to Railways/PSUs only, and emphasizes sanctions for forged certificates. Location and precise delivery details are implicit in the Southern Railway procurement framework.
Technical Specifications & Requirements
- Standards: IS 7098 (Part 1) conformity; ISI marked BIS certification; cables suitable for mining and low-temperature service; classification for improved fire performance.
- Conductor/Insulation: Nominal cross-section area (Sq mm), inner sheath type, and conductor material as per BOQ/technical terms.
- Armouring/Construction: Type of cable, armour material, and overall construction details; optional test reports availability.
- Performance: Fire performance category, temperature ratings, voltage rating up to 1.1 kV; suitability for railway environments.
- Documentation: OEM authorization, BIS license/certification, Udyam/NSIC factory registration where applicable.
Terms, Conditions & Eligibility
- EMD: ₹89,995; submission via online/RTGS as per bid guidelines.
- Delivery/Option Clause: Purchaser may increase/decrease quantity up to 25%; extended delivery period calculated as (additional quantity/original quantity) × original delivery days, minimum 30 days.
- Eligibility: OEM/BIS-approved manufacturers; bid-specific authorization letters; past performance evidence with contracts for similar items; supplier credentials restricted to Railways/PSU/central or state government projects. Self-certifications mandatory to avoid bid rejection.
- Warranty/Compliance: Compliance with ISI/BIS standards; forged certificate risks contract termination and deposition forfeiture.
