GEM

Rural Development And Panchayat Raj Department Maharashtra High Mast Lighting Octagonal Tower with Solar LED Street Light Tender 2025 Pune

Bid Publish Date

06-Dec-2025, 2:17 pm

Bid End Date

16-Dec-2025, 3:00 pm

Progress

Issue06-Dec-2025, 2:17 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

5

Bid Type

Two Packet Bid

Key Highlights

  • Solar street light specifications: octagonal high mast tower with LED lamps
  • Quantity flexibility: 25% increase on bid quantity and during contract currency
  • Delivery adjustment: formula-based extension with minimum 30 days
  • Service center requirement: functional in-state center within 30 days of award
  • Dedicated toll-free service line and escalation matrix mandatory
  • Detailed Design Drawings: buyer approval within 5 days of award
  • Financial standing: bidder must declare no liquidation or bankruptcy
  • Payment terms: linked to SITC readiness and drawings approval

Categories 7

Tender Overview

The Rural Development And Panchayat Raj Department, Maharashtra, seeks a supplier for a High Mast Lighting Octagonal Tower with Solar Based LED Street Light in Pune, MAHARASHTRA 410301. Scope includes Supply, Installation, Testing and Commissioning of the solar street light system. The contract contemplates an option to expand quantity by up to 25% and requires adherence to delivery timelines as defined by the original delivery period, with potential adjustments. A key differentiator is the integration of solar-based LEDs on an octagonal mast, intended for municipal-scale public lighting projects within the district. The bid must demonstrate capability to furnish complete turnkey execution, including design, fabrication, and on-site commissioning.

Technical Specifications & Requirements

  • System: Solar street light with octagonal high mast tower and LED lighting.
  • Deliverables: Supply, Installation, Testing and Commissioning (SITC) of all components.
  • Delivery flexibility: quantity may vary by up to 25% during contract and currency; extended delivery calculations apply with a minimum of 30 days.
  • After-sales: bidders must establish a functional service center in the state within 30 days of award; dedicated toll-free service line and escalation matrix required.
  • Drawings: Detailed Design Drawings must be approved within 5 days of award; non-approval may extend delivery without LD.
  • Financial: bidders must provide an undertaking against liquidation or bankruptcy; not specified in this tender but required by terms.
  • Warranty/Support: on-site or carry-in warranty depending on the equipment; service availability to be demonstrated.

Terms, Conditions & Eligibility

  • Quantity variation right up to 25%; delivery schedule recalculated accordingly.
  • SITC scope and payment are tied to design approvals and evidence of a functional service center.
  • Service center requirement: in-state availability in the consignee’s location; 30 days to establish if not present.
  • Escalation and toll-free support obligations to be provided by bidder/OEM.
  • Bidder must certify compliance with legal financial status (no liquidation/bankruptcy) via an undertaking.
  • Detailed design drawings must be approved by the buyer within 5 days; any buyer-driven modifications must be incorporated.
  • Penalties and LD clauses not expressly stated beyond delivery adjustments; ensure alignment with ATC terms.

Key Specifications

  • Product category: Solar street lighting system with High Mast Octagonal Tower

  • Scope: Supply, Installation, Testing & Commissioning

  • Delivery flexibility: +/- up to 25% quantity; minimum 30 days additional time

  • Service support: in-state service center; toll-free service number; escalation matrix

  • Design approvals: Detailed drawings to be approved within 5 days of award

Terms & Conditions

  • Option to increase/decrease quantity by 25% during contract

  • SITC scope including installation and commissioning

  • State-level service center presence or establishment within 30 days

  • Dedicated service contact and escalation framework required

  • Buyer approval for Detailed Design Drawings within 5 days

Important Clauses

Payment Terms

Payments linked to SITC milestones and drawing approvals; service center evidence required prior to payment release.

Delivery Schedule

Delivery period based on original delivery period; extended delivery time formula applies for option quantity changes.

Penalties/Liquidated Damages

Not explicitly stated; delivery adjustments to be governed by option clause; verify any LD terms during bid submission.

Bidder Eligibility

  • Not under liquidation, court receivership, or bankruptcy

  • Capability to supply SITC solar street light systems with octagonal mast

  • Functional service center in Maharashtra or ability to establish within 30 days

Past Similar Tenders (Historical Results)

5 found

High Mast Lighting Octagonal Tower with Solar Based LED Street Light

Bhandara District Panchayats

BHANDARA, MAHARASHTRA

Posted: 8 July 2025
Closed: 18 July 2025
GEM

High Mast Lighting Octagonal Tower with Solar Based LED Street Light

Bhandara District Panchayats

BHANDARA, MAHARASHTRA

Posted: 8 July 2025
Closed: 18 July 2025
GEM

High Mast Lighting Octagonal Tower with Solar Based LED Street Light

Pune District Panchayats

PUNE, MAHARASHTRA

Posted: 14 July 2025
Closed: 24 July 2025
GEM

High Mast Lighting Octagonal Tower with Solar Based LED Street Light

N/a

SINDHUDURG, MAHARASHTRA

Posted: 30 June 2025
Closed: 10 July 2025
GEM

High Mast Lighting Octagonal Tower with Solar Based LED Street Light

N/a

GADCHIROLI, MAHARASHTRA

Posted: 25 June 2025
Closed: 5 July 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar solar street light projects

4

Financial statements (latest) and undertaking of non-liquidation

5

EMD security deposit details (if applicable in this tender)

6

Technical compliance documents and OEM authorizations (if applicable)

7

Detailed design drawings as per buyer approvals (within 5 days of award)

8

Service center certification or plan to establish in-state within 30 days

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid for the solar street light tender in Pune Maharashtra 2025?

Bidders must submit GST, PAN, experience certificates, financial statements, EMD (if applicable), OEM authorizations, and detailed design drawings within 5 days of award; ensure a functional in-state service center or a plan to establish one within 30 days, along with a toll-free service line and escalation matrix.

What are the key eligibility criteria for high mast lighting tender in Maharashtra?

Eligibility requires non-liquidation status, demonstration of prior SITC solar street light experience, and the ability to establish a state-level service center within 30 days; ensure financial health via accompanying statements and undertaking.

What documents are required for submission in the Pune solar light tender?

Submit GST certificate, PAN card, experience certificates for similar projects, latest financial statements, EMD details, technical compliance certificates, OEM authorizations if applicable, and Detailed Design Drawings approved within 5 days of award.

What is the delivery extension rule for quantity variations?

Delivery time extends using the formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days; the purchaser may extend up to the original delivery period during option exercise.

What are the service support requirements for the solar street light bid?

Bidder must have a dedicated toll-free service line, an escalation matrix, and a functional service center in the state; if absent, establish within 30 days of award and provide documentary evidence prior to payment.

What is required for Detailed Design Drawings in this tender?

Submit Detailed Design Drawings within 5 days of award; buyer will approve or specify modifications within 5 days; if approvals delay, delivery period is adjusted without liquidated damages for the period of drawing approval delay.

What is the scope of SITC in the Maharashtra solar light tender?

Scope includes Supply, Installation, Testing and Commissioning of the solar street light system, ensuring compliance with the approved drawings and on-site commissioning, along with post-installation service support as per terms.

Are there quantity fluctuation rights in this tender?

Yes, the purchaser reserves the right to vary quantity up to 25% at the time of placement and during contract currency, at contracted rates; additional delivery time is calculated accordingly with a minimum 30 days.

Similar Tenders

1 found

High Mast Lighting Octagonal Tower with Solar Based LED Street Light

Ramanagara District Panchayats

📍 Bangalore Rural, KARNATAKA

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM