FUEL PUMP ASSY,HEAD GASKET,FIEL COIL ASSY,ARMATURE ASSY,CLUTCH PLATE,R KIT WATER PUMP,OIL SEAL ASSY
Indian Army
BATHINDA, PUNJAB
Bid Publish Date
20-Nov-2025, 12:20 pm
Bid End Date
01-Dec-2025, 1:00 pm
Bid Opening Date
01-Dec-2025, 1:30 pm
Value
₹56,000
Location
Progress
Quantity
7
Category
RECTIFIRE ALTERNATOR
Bid Type
Two Packet Bid
The contract is issued by the Indian Army under the Department Of Military Affairs for the procurement of multiple military spare parts, including items like RECTIFIRE ALTERNATOR, BRUSH HOLDER CARRIER, FUEL PUMP, GOVERNOR PLATE, METER ELECT FREQ, ARMATURE ASSY, and OIL SEAL SET. Estimated value is ₹56,000.00 with a flexible quantity clause allowing up to ±25% variation at contract placement and during execution. Scope specifies Only supply of Goods, with no product category details beyond the listed parts. The tender emphasizes sample approval prior to bulk manufacturing and requires compliance with buyer-specified terms, including adherence to delivery timelines and modification allowances if needed.
Product names: RECTIFIRE ALTERNATOR, BRUSH HOLDER CARRIER, FUEL PUMP, GOVERNOR PLATE, METER ELECT FREQ, ARMATURE ASSY, OIL SEAL SET
Quantities: not specified in BOQ; total items = 7; estimated value ₹56,000.00
EMD: not specified in tender data
Experience requirement: not explicitly stated; ensure financial solvency per buyer terms
Quality standards: IS/ISO certifications not specified; ensure certificates uploaded with bid
Up to 25% quantity variation during contract execution with adjusted delivery
Advance sample approval required within 5 days of award, modifications within 5 days
Supply-only scope; bid must include all cost components and relevant certificates
Not specified in data; bid must comply with standard government payment practices following delivery and acceptance
Delivery period linked to last date of original delivery order; extended delivery time formula provided; ensure readiness for schedule recalibration
Not specified; contract may include LDs per standard procurement terms; verify during bid submission
Not under liquidation or court receivership; must upload an undertaking
Adequate financial standing to cover contract value and variations
Capability to supply GOODS as listed and meet advance sample approval requirement
Indian Army
BATHINDA, PUNJAB
Indian Army
SOLAN, HIMACHAL PRADESH
Indian Army
Indian Army
Indian Army
BHARATPUR, RAJASTHAN
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | RECTIFIRE ALTERNATOR | GENR 15 KVA | 1 | nos | darab@singh | 15 |
| 2 | BRUSH HOLDER CARRIER | GENR 15 KVA | 1 | nos | darab@singh | 15 |
| 3 | FUEL PUMP | GENR 3.5 KVA | 1 | nos | darab@singh | 15 |
| 4 | GOVERNOR PLATE | GENR 3.5 KVA | 1 | nos | darab@singh | 15 |
| 5 | METER ELECT FREQ | GENR 15 KVA | 1 | nos | darab@singh | 15 |
| 6 | ARMATURE ASSY | GENR 15 KVA | 1 | nos | darab@singh | 15 |
| 8 | OIL SEAL SET | GENR 3.5 KVA | 1 | set | darab@singh | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar supply of military spare parts
Financial statements or proof of financial standing
Advance sample submission document (within 5 days of award) and approval status
Technical compliance certificates and OEM authorizations (if applicable)
Key insights about JAMMU AND KASHMIR tender market
Bidders should submit all required documents (GST, PAN, financials, experience certificates) and ensure upload of any OEM authorizations. Ensure compliance with the 5-day advance sample submission and the 5-day approval period; prepare for up to 25% quantity variation and align with delivery timeline rules.
Required documents include GST registration, PAN, experience certificates for similar supplies, financial statements, EMD where applicable, advance sample submission details, and any technical compliance certificates or OEM authorizations. Missing documents can lead to bid rejection.
The tender lists part names such as RECTIFIRE ALTERNATOR and ARMATURE ASSY but provides no detailed technical specs. Vendors should rely on buyer-specified samples and any BOQ item-level details, ensuring all supplied goods meet buyer-approved sample tolerances.
An advance sample must be submitted within 5 days of contract award. The buyer will respond within 5 days with approval or required modifications; bulk supply depends on approved sample conformity.
Delivery timing is calculated from the last date of the original delivery order, with options to extend for increased quantities. If delays occur on buyer approval, delivery period may be fixed without LD for the delay period.
The purchaser can adjust quantities by up to 25% at contract award and during the contract, with delivery timelines recalculated proportionally. Price remains at contracted rates; extended delivery may require revalidation of timelines.
Bidder must demonstrate sound financial standing, avoid liquidation or bankruptcy, and upload an undertaking. They should also provide relevant experience certificates and ensure compliance with certificate submission requirements to avoid rejection.
Prepare one advance sample within 5 days of award; ensure documentation for OEM or certification authorities is ready. If sample deviates, buyer may require new samples or terminate the contract; ensure all samples are free of defects.
Access all tender documents at no cost
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS