GEM

Open Tender for (SZ6032D-MCTB-0.8) (PRESSURE SIGNALL),(SZ6032D-MCTB-. 0.8A) (PRESSURE SIGNALL),(SR6001D-KP(D) 2-7-5 in MUMBAI, MAHARASHTRA

Bid Publish Date

08-Dec-2025, 5:07 pm

Bid End Date

30-Dec-2025, 11:00 am

Progress

Issue08-Dec-2025, 5:07 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

22

Category

(SR6001D-KP(D) 2-7-5/7-5-2-8(B) (PRESSURE RELAY, DUAL CHANNEL KP(D) 2--7, 5/7, 5-2, 8B/4, 2A)

Bid Type

Single Packet Bid

Categories 1

Indian Navy invites bids for (SZ6032D-MCTB-0. 8) (PRESSURE SIGNALL), (SZ6032D- MCTB-. 0. 8A) (PRESSURE SIGNALL), (SR6001D-KP(D) 2-7- 5/7-5-2-8(B) (PRESSURE RELAY, DUAL CHANNEL KP(D) 2--7, 5/7, 5-2, 8B/4, 2A) in MUMBAI, MAHARASHTRA. Quantity: 22. Submission Deadline: 30-12-2025 11: 00: 00. Submit your proposal before the deadline.

Past Similar Tenders (Historical Results)

5 found

Relay 67-EP-6-2C/7 SPL

Indian Army

PUNE, MAHARASHTRA

Posted: 15 September 2025
Closed: 25 September 2025
GEM

Indian Army RELAY 67 EP 24-2C/7-P16 Spl Procurement Tender 2025 Rajasthan

Indian Army

PUNE, MAHARASHTRA

Posted: 25 October 2025
Closed: 15 November 2025
GEM

25BWAL103 (EW9090V-P5) SPEED TACHOMETER,25BWAL103 (EW9090V-US-S180-156-812) VOLTAGE CONTROL RELAY,(

Indian Navy

MUMBAI, MAHARASHTRA

Posted: 3 May 2025
Closed: 12 May 2025
GEM

LOW PRESSURE SENSOR (PRESSURE SWITCH) , Part no: 50304,OVERLOAD RELAY, Part no: J239537,FRONT CAP P

Indian Coast Guard

AMRELI, GUJARAT

Posted: 8 February 2025
Closed: 21 April 2025
GEM

PRESSURE SWITCH / SENSOR MODEL-PK6522, 24V DC, MAX. PRESSURE-200 BAR, OPERATING PRESSURE 0-100 BAR.

Advanced Weapons And Equipment India Limited

KANPUR NAGAR, UTTAR PRADESH

Posted: 23 April 2025
Closed: 14 May 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

Additional Doc 1 (Requested in ATC)

7

Additional Doc 2 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer