Two Ton Hiwall split AC,5 KVA stabilizer,Copper Refrigerant pipe,UPVC Plumbing pipe,Suitable powder
National Institute Of Ocean Technology (niot)
NELLORE, ANDHRA PRADESH
Menu
Bid Publish Date
22-Nov-2025, 3:51 pm
Bid End Date
20-Dec-2025, 5:00 pm
Location
Progress
Quantity
140
Category
2 Ton 5 Star Split AC with standard Box Pack 3 Meter Copper Pipe
Bid Type
Two Packet Bid
Organization: Indian Institutes Of Science Education And Research (iiser) – Department Of Higher Education. Location: NADIA, WEST BENGAL - 741101. Product/Service: procurement of 1.5 Ton 5 Star Split AC with standard Box Pack including 3 Meter Copper Pipe, and 2 Ton 5 Star Split AC with same Box Pack plus Fitting and installation of Heavy-Duty Steel Wall Mounting Brackets, Water Pipe, and Additional Copper Pipe with Installation including wrapping. Quantity/Scale: combined scope covers multiple air-conditioning units with installation services; exact numbers not disclosed. Estimated Value/EMD: not disclosed. Unique terms include an option clause allowing up to 25% quantity variations at contracted rates and an extended delivery timeline formula. The bidder must ensure product data sheets align with offered specifications and that installation is performed by OEM-certified personnel. Context: bid supports campus climate control requirements across IISER facilities in Nadia. Differentiators include mandatory data sheet verification, non-obsolete product life of at least 5 years, and GST handling guidance as per actual rates.
Key Term 1: 25% quantity variation allowed at contract execution
Key Term 2: extended delivery time formula with minimum 30 days
Key Term 3: data sheets must align with offered products; non-matching tech params may lead to rejection
GST handling is bidder-responsible; actual GST applicable will be reimbursed or capped to quoted rate; no responsibility on purchaser for GST variance
Delivery period commences from last date of original delivery order; option clause may extend time based on (increased quantity/original quantity) × original delivery period, minimum 30 days
Not specified in available data; penalties likely governed by embedded terms or purchase order
Non-liquidation, non-bankrupt status with undertaking
OEM or OEM-authorised reseller with proven govt/PSU supply
Minimum 1 year prior experience manufacturing/supplying same category products
National Institute Of Ocean Technology (niot)
NELLORE, ANDHRA PRADESH
Indian Army
MEERUT, UTTAR PRADESH
Directorate General Of Lighthouses And Lightships
RAMANATHAPURAM, TAMIL NADU
Hindustan Petroleum Corporation Ltd
MUMBAI, MAHARASHTRA
Indian Army
JAISALMER, RAJASTHAN
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | 1.5 Ton 5 Star Split AC with standard Box Pack 3 Meter Copper Pipe | 1.5 Ton 5 Star Split AC with standard Box Pack 3 Meter Copper Pipe | 1 | set | oa_snp_31 | 45 |
| 2 | 2 Ton 5 Star Split AC with standard Box Pack 3 Meter Copper Pipe | 2 Ton 5 Star Split AC with standard Box Pack 3 Meter Copper Pipe | 7 | set | oa_snp_31 | 45 |
| 3 | Fitting and installation of Heavy-Duty Steel Wall Mounting Brackets | Fitting and installation of Heavy-Duty Steel Wall Mounting Brackets | 8 | pair | oa_snp_31 | 45 |
| 4 | Fitting and installation Water Pipe | Fitting and installation Water Pipe | 100 | feet | oa_snp_31 | 45 |
| 5 | Additional Copper Pipe with Installation including wrapping | Additional Copper Pipe Installation and wrapping | 24 | meter | oa_snp_31 | 45 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates showing government/PSU supplies
Financial statements demonstrating financial stability
EMD/ security deposit submission proof
Technical data sheets of offered AC units
OEM authorization / reseller authorization documents
End User Certificate (if requested in buyer format)
Purchase order copies or contract references from prior similar supply
Extended Deadline
20-Dec-2025, 5:00 pm
Opening Date
20-Dec-2025, 5:30 pm
Key insights about WEST BENGAL tender market
Bidders must submit GST, PAN, financials, experience certificates, and OEM authorizations along with data sheets for both 1.5T and 2T 5 Star split AC units. Include installation qualifications and data-sheet alignment. The bid will require OEM-certified installation personnel and adherence to option clause terms, with delivery timelines per contract.
Required documents include GST registration, PAN, annual financial statements, government/PSU supply certificates, OEM authorization, technical data sheets for offered models, installation capability proof, and an End User Certificate if requested by the buyer.
Offered models must be 1.5 Ton 5 Star and 2 Ton 5 Star split ACs with standard box pack and 3 meter copper pipe. Data sheets must match, and installation must be performed by OEM-certified personnel. No explicit IS standards listed; bidders should ensure OEM lifecycle compliance and non-obsolete status.
The purchaser may increase or decrease quantity up to 25%. Delivery extension uses the formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. If original period is under 30 days, extended time equals the original period.
Data sheets of offered AC units must be uploaded and cross-checked with product specifications. Any mismatch may lead to bid rejection, ensuring the supplier’s model, capacity, and components align with the tender’s required configuration.
Bidders or OEMs must show at least 1 year of regular government/PSU supply of the same category products, with copies of relevant contracts. Bidders must not be in liquidation and should provide a formal undertaking as part of the bid.
Installation, commissioning, testing, and training (if applicable) must be conducted by OEM/OEM-certified resources or OEM-authorised resellers. This ensures proper integration with building systems and adherence to warranty terms.
GST is bidder-borne; reimbursement will be at actuals or the lower of the quoted rate, subject to the maximum GST percentage quoted. The purchaser assumes no GST-related risk beyond the quoted rate.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Choose from flexible plans to access tender documents instantly
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS