GEM

Indian Army Fuel Filters Tender Kupwara Jammu & Kashmir 2025 – V Belt, Hoses, Pivot Pin Specifications

Bid Publish Date

21-Nov-2025, 6:21 pm

Bid End Date

11-Dec-2025, 7:00 pm

Bid Opening Date

11-Dec-2025, 7:30 pm

Progress

Issue21-Nov-2025, 6:21 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

44

Category

FUEL FILTER

Bid Type

Two Packet Bid

Categories 4

Tender Overview

The Indian Army, Department Of Military Affairs, invites bids for a multi-item procurement including FUEL FILTER, V BELT, SHIM 1.5 MM, HOSE, and PIVOT PIN under a single tender in Kupwara, Jammu & Kashmir 193221. The BOQ lists 5 items with unspecified quantities and an estimated value not disclosed. The buyer reserves a 25% quantity variation upfront and during the contract, with delivery timing tied to the last delivery order date. Post-receipt inspection will occur at the consignee site. GST handling is bidder’s concern, with reimbursement as per actuals or applicable rates. ANon-disclosure clause and vendor-code documentation are required, including PAN, GSTIN, cancelled cheque, and EFT mandate.

Technical Specifications & Requirements

  • Items named in the BOQ: FUEL FILTER, V BELT, SHIM 1.5 MM, HOSE, PIVOT PIN. No explicit technical specs provided in the tender.
  • Inspection: Post Receipt Inspection at consignee site; Pre-dispatch inspection not applicable unless ATC specifies otherwise.
  • Delivery: Option clause allows up to 25% quantity increase/decrease; delivery period adjustments computed as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
  • Compliance & documentation: GST considerations advised by bidder; mandatory documents include PAN, GSTIN, cancelled cheque, EFT mandate; NDA to be submitted on bidder letterhead.
  • Standards/quality: Not specified in given data; bidders should verify any organization-wide conformity during bid submission.

Terms, Conditions & Eligibility

  • EMD/financial security: Not disclosed in the provided data; ensure bid includes required security as per ATC.
  • Eligibility: No liquidation or bankruptcy; bidder to upload undertaking; bidder must upload all required certificates/documents to avoid rejection.
  • Documentation: PAN, GSTIN, cancelled cheque, EFT mandate; Non-disclosure agreement required; inspection agencies to be named by buyer; GST adherence noted.
  • Payment & delivery: GST reimbursements per actuals or applicable rates; delivery terms aligned to delivery orders; option clause enables flexible quantity management during contract.
  • Compliance: Bidder to ensure all terms, certificates, and documents sought in bid/ATC are uploaded; failure leads to rejection.

Key Specifications

  • Product names from BOM: FUEL FILTER, V BELT, SHIM 1.5 MM, HOSE, PIVOT PIN

  • Estimated value: Not disclosed

  • Quantity: Not disclosed (BOQ items show N/A)

  • Delivery framework: 25% quantity variation allowed; delivery period computed per rule

  • Inspection: Post Receipt Inspection at consignee site; pre-dispatch inspection not applicable

  • GST: Bidder to manage GST; reimbursement as actual or applicable rate (whichever lower) up to quoted rate

Terms & Conditions

  • EMD/ security: Not disclosed; bidders must reference ATC for exact amount

  • Delivery: 25% quantity up/down; minimum 30 days adjustment

  • Documents: PAN, GSTIN, cancelled cheque, EFT mandate; NDA required

Important Clauses

Payment Terms

GST reimbursement to be as per actuals or applicable rates, whichever is lower, within quoted GST percentage

Delivery Schedule

Delivery period calculated from the last date of original delivery order; extended time proportional to quantity change, minimum 30 days

Penalties/Liquidated Damages

Not explicitly stated in provided data; vendors should verify in ATC/ATC Corrigendum

Bidder Eligibility

  • Not under liquidation, court receivership, or bankruptcy

  • Must upload undertaking confirming financial stability

  • Must submit PAN, GSTIN, cancelled cheque, EFT mandate

Past Similar Tenders (Historical Results)

5 found

Fuel Filter,Fuel Water Separator,Air Filter,Oil Filter,Alternator Belt,FAN Belt

Indian Army

WEST KAMENG, ARUNACHAL PRADESH

Posted: 22 July 2025
Closed: 7 August 2025
GEM

OIL FILTER,FUEL FILTER,AIR FILTER,FUEL PIPE,FAN BELT,FUEL PIPE

Indian Army

BIKANER, RAJASTHAN

Posted: 8 January 2025
Closed: 3 February 2025
GEM

Air Filter,Oil Filter,Fuel Filter,Fan Belt,Alternator,Fuel Filter Assy,Tapped Cover Gasket

Indian Army

POONCH, JAMMU & KASHMIR

Posted: 19 August 2025
Closed: 5 September 2025
GEM

FUEL FILTER,OIL FILTER,FAN BELT,AIR FILTER,NOZZLE INJECTOR,FUEL PIPE

Indian Army

DARJEELING, WEST BENGAL

Posted: 16 December 2024
Closed: 6 January 2025
GEM

FUEL FILTER,FUEL PIPE,WATER SEPEREATER,FAN BELT,AIR FILTER,OIL FILTER

Indian Army

DARJEELING, WEST BENGAL

Posted: 19 January 2025
Closed: 10 February 2025
GEM

Bill of Quantities (BOQ) 5 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 FUEL FILTER LV7 JCB 48 117 02 0 00 FUEL FILTER 8 nos pro865 15
2 V BELT LV7 JCB 4H 692 01 0 00 V BELT 6 nos pro865 15
3 SHIM 1 5 MM LV7 JCB 11 5352112676056 SHIM 1 5 MM 21 nos pro865 15
4 HOSE LV7 JCB 613 011200 HOSE 4 nos pro865 15
5 PIVOT PIN LV7 JCB 811 70049 PIVOT PIN 5 nos pro865 15

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Copy of PAN Card

2

Copy of GSTIN

3

Copy of Cancelled Cheque

4

Copy of EFT Mandate certified by Bank

5

Non-Disclosure Declaration certificate on Bidder letterhead

6

Bidder undertakings regarding financial standing (no liquidation or bankruptcy)

7

Any certificates/documents sought in Bid Document/ATC/Corrigendum

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

How to bid for Indian Army fuel filter tender in Kupwara 2025

Bidders must meet eligibility: no liquidation, provide PAN and GSTIN, cancelled cheque, EFT mandate, and NDA. Submit all bid documents per ATC, including any certificates cited. Ensure post-receipt inspection readiness and GST handling aligned with actuals or lower applicable rate.

What documents are required for the Kupwara fuel filter tender submission

Required documents include PAN Card, GSTIN, Cancelled Cheque, EFT Mandate certified by bank, and a Non-Disclosure Declaration. Also provide undertakings on financial standing and any certificates requested in the Bid Document/ATC/Corrigendum to avoid rejection.

What are the delivery terms for quantity variation in this Army tender

The contract allows up to 25% variation in quantity at the time of order placement and during the currency of the contract at contracted rates. Delivery periods adjust proportional to quantity changes, with a minimum of 30 days determined from the last delivery order date.

Which items are included under the Kupwara procurement for Army supplies

Items include FUEL FILTER, V BELT, SHIM 1.5 MM, HOSE, and PIVOT PIN. The BOQ lists 5 items; precise quantities are not disclosed publicly, requiring bidders to review the ATC for item-wise details.

What are the GST considerations for this Army tender in Kupwara

Bidders must determine GST applicability themselves; reimbursement will follow actual GST or the lower applicable rate, capped by the quoted GST percentage. Ensure proper GSTIN filing and compliance documentation with bid submission.

What is the post-delivery inspection process for this procurement

Post Receipt Inspection will be conducted at the consignee site before acceptance by the Buyer organization. Pre-dispatch inspection is not applicable unless specified in ATC. Prepare to provide delivery records and conformity certificates if requested.

What are the key eligibility criteria for participating suppliers

Eligible bidders must not be under liquidation or bankruptcy, upload an undertaking confirming financial health, and submit PAN, GSTIN, cancelled cheque, and EFT mandate. Ensure alignment with NDA requirements and any ATC-listed certificates to avoid rejection.

How will the 25% quantity variation affect delivery timelines

If quantity increases, the delivery period extends proportionally: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days. The clause also allows extension to original delivery period depending on contract terms.