GEM

Contract Bidding Open For Change over switch 200 Amps, 4 Pole TPN,Cable XLPE insulated screened PVC bedded, 1000 volt, alumin in BHOPAL, MADHYA PRADESH

Bid Publish Date

16-Dec-2025, 2:01 pm

Bid End Date

26-Dec-2025, 3:00 pm

EMD

₹55,000

Location

BHOPAL , MADHYA PRADESH

Progress

Issue16-Dec-2025, 2:01 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

52

Category

DG Set slient type of rated capacity 62.5 KVA

Bid Type

Two Packet Bid

Categories 8

Public procurement opportunity for Indian Army Change over switch 200 Amps, 4 Pole TPN, Cable XLPE insulated screened PVC bedded, 1000 volt, aluminium conductor of size 25Sqmm, 4 core, FRL, DG Set slient type of rated capacity 62. 5 KVA in BHOPAL, MADHYA PRADESH. Quantity: 52 issued by. Submission Deadline: 26-12-2025 15: 00: 00. View full details and respond.

Past Similar Tenders (Historical Results)

5 found

MCB change over switch 4 pole 63 amp,MCB normal 4 pole 63 amp,MCB change over switch 2 pole 40 amp,

Indian Army

BHOPAL, MADHYA PRADESH

Posted: 4 September 2025
Closed: 15 September 2025
GEM

Change over 200 AMPS,04 sqmm Copper wire,PVC insulated 1.5 sqmm copper,Flexible wire 1 sqmm copper

Indian Army

PITHORAGARH, UTTARAKHAND

Posted: 20 February 2025
Closed: 13 March 2025
GEM

Indian Army SWITCH BOARD & CHANGE OVER SWITCH Procurement 63A COALITED CABLE 2025

Indian Army

BARAMULLA, JAMMU & KASHMIR

Posted: 9 November 2025
Closed: 19 November 2025
GEM

WIRE 1 MM,PHOTOSTATE PAPER A4,REPAIR DAY BOOK 300 PAGES,CHANGE OVER SWITCH 100 AMP,CHANGE OVER SWIT

Indian Army

JAMMU, JAMMU & KASHMIR

Posted: 24 September 2025
Closed: 4 October 2025
GEM

Cable 35 Sqmm 3.5 Core Al Ar XLPE 1100 volt,Cable 95 Sqmm 3.5 Core Al Ar XLPE 1100 volt,Cable 50 Sq

Sambhar Salts Limited

NAGAUR, RAJASTHAN

Posted: 31 December 2024
Closed: 21 January 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

OEM Authorization Certificate

5

OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer