12 V 200Ah Tall Tubular Inverter Battery,Inverter 12 V 1375VA Microcontroller based pure sine wave,
Indian Army
Menu
Bid Publish Date
09-Dec-2025, 7:41 pm
Bid End Date
19-Dec-2025, 8:00 pm
Progress
Quantity
10
Category
Tubular battery 200 Ah 12 v
Bid Type
Two Packet Bid
The opportunity comes from the Indian Army under the Department Of Military Affairs for electrical backup equipment, including a 1050 watt inverter (verter), Tubular battery 200 Ah 12 V, Tubular battery 150 Ah 12 V, an inverter battery trolley, and an extension board with spike protection 6 Amp. Quantities and estimated value are not disclosed, but a 25% quantity variation is allowed, with contract pricing at the original rates. Location details are not specified in the data provided, emphasizing national deployment across Indian Army installations. A single multi-item procurement with five BOQ items is implied, requiring coordinated supply, delivery, and integration with existing power backup infrastructure. The option clause enables staged expansion within the contract lifecycle, subject to delivery performance. This tender emphasizes standard backup power components for field or garrison use and may require OEM authorizations and compliance with Army procurement norms. The absence of explicit delivery deadlines or EMD amounts necessitates bidders to seek clarifications early.
Inverter: 1050 watt
Battery 1: Tubular 200 Ah 12 V
Battery 2: Tubular 150 Ah 12 V
Accessory: Inverter battery trolley
Accessory: Extension board with Spike protection 6 Amp
25% quantity variation allowed by purchaser
Minimum 30 days delivery time, extended as per formula
Delivery period linked to last date of original delivery order
EMD amount and exact quantities not disclosed
Not specified in data; bidders should seek confirmation on payment milestones with Army procurement
Delivery period calculation follows (additional quantity ÷ original quantity) × original delivery period, minimum 30 days
No LD details provided in current data; verify in contract terms
Experience supplying backup power equipment (inverter batteries, tubular batteries) within the last 5 years
Ability to provide OEM authorizations or authorized distributor credentials
Financial viability evidenced by audited statements and GST compliance
Indian Army
Indian Air Force
BIDAR, KARNATAKA
Ayush Department
DAVANGARE, KARNATAKA
Indian Army
Indian Army
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | verter 1050 watt | verter 1050 watt | 2 | nos | buyer2020mf | 10 |
| 2 | Tubular battery 200 Ah 12 v | Tubular battery 200 Ah 12 v | 1 | nos | buyer2020mf | 10 |
| 3 | Tubular battery 150 Ah 12 v | Tubular battery 150 Ah 12 v | 2 | nos | buyer2020mf | 10 |
| 4 | Inverter battery trolley | Inverter battery trolley | 2 | nos | buyer2020mf | 10 |
| 5 | Extn Bd with Spike protection 6 Amp | Extn Bd with Spike protection 6 Amp | 3 | nos | buyer2020mf | 10 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar battery/inverter supply
Financial statements / solvency proof
EMD submission document (amount not disclosed in tender data; confirm)
Technical bid documents showing product compliance
OEM authorization/authorized distributor certificate (if applicable)
Bidders should first confirm the exact quantities and delivery locations, then submit GST, PAN, and experience certificates along with OEM authorizations if applicable. Ensure compliance with the 1050 watt inverter and tubular 200 Ah/12 V and 150 Ah/12 V batteries. The submission must include technical bid documents and EMD details once disclosed by the agency.
Required documents typically include GST registration, PAN card, audited financial statements, experience certificates for similar supply, EMD submission, OEM authorizations, and technical compliance certificates. Since exact EMD is not disclosed, obtain it from the tender notice or contact the procurement cell for current values before submission.
Technical scope includes a 1050 watt inverter, tubular batteries of 200 Ah and 150 Ah, all at 12 V. While no additional performance specs are published, bidders should provide full load testing data, safety certifications, and compatibility with spike-protected extension boards to meet Army power backup standards.
The delivery period follows a formula linked to the original delivery order with a minimum of 30 days. Additional time is proportional to the increase in quantity, calculated as (increase ÷ original) × original period, ensuring supply readiness for Army installations.
Eligibility typically requires prior experience in supplying backup power equipment, GST registration, and sound financial health. OEM authorizations or authorized distributor status strengthens eligibility. Confirm any Army-specific prerequisites during pre-bid clarifications to ensure alignment with procurement norms.
The extension board with spike protection 6 Amp is intended to safeguard sensitive inverter/battery loads from voltage spikes. Bidders should certify that extensions meet surge protection standards, provide compatibility with 1050W inverters, and confirm耐ance to Army electrical safety requirements.
Obtain OEM authorization letters or distributorship certificates showing active status. Contact the Army procurement cell to verify current approved brands, model numbers, and warranty terms. Include OEM support commitments and service options as part of the technical bid submission.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Choose from flexible plans to access tender documents instantly
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS