Fuel Filter Assy,Kit Filter Assy,Air Filter,Fuel pump Assy,Water pump Assy,oil Seal,timing Belt,Vac
Indian Army
SOLAN, HIMACHAL PRADESH
Bid Publish Date
17-Nov-2025, 1:25 pm
Bid End Date
02-Dec-2025, 10:00 am
Bid Opening Date
27-Nov-2025, 2:30 pm
Location
Progress
Quantity
116
Category
Valve shut down
Bid Type
Two Packet Bid
The procurement is issued by the Indian Army under the Department Of Military Affairs for a range of mechanical and fuel system components, including Air Filter Outer, Service Kit Water Pump, Hose Assembly, and related fittings. The BOQ indicates a total of 13 items with unspecified quantities. The tender describes vendor obligations such as option-based quantity adjustments up to 25%, and a requirement to obtain Detailed Design Drawings approval prior to fabrication. The process contemplates potential delivery adjustments if drawings are delayed, and imposes a formal prohibition on obsolete parts, with a market-life minimum of 3 years. GST considerations are contractor-driven with reimbursement rules defined. Submittals include organizational identifiers such as PAN, GSTIN, and EFT mandates. The tender emphasizes confidentiality commitments via a Non-Disclosure Declaration. The contracting framework targets defense-grade mechanical components, requiring strict compliance with design approval timelines and dynamic quantity management. The opportunity sits within the defense procurement ecosystem and may require OEM alignment and long-term support. This tender presents a structured yet flexible delivery and approval regime for specialized parts.
Air Filter Outer and Service Kit Water Pump listed among 13 BOQ items
Hose Assembly from fuel tank to water separator and related components
3-year residual market life for offered items; avoid end-of-life products
Option quantity flexibility up to 25% and extended delivery time calculations
5-day turnaround for Detailed Design Drawings approval and modification list
Option-based quantity adjustments up to 25% with extended delivery time rules
Mandatory Detailed Design Drawings approvals within 5 days of award
3-year market life requirement and non-obsolescence criterion
GST payable by bidder with reimbursement as actuals or lower rate; no explicit advance or milestone terms specified
Delivery periods may be adjusted based on option quantity changes; 30-day minimum extension rule; original delivery period resets with extended quantity
Not explicitly detailed in terms provided; LD would be subject to standard contract terms following delivery and acceptance
Not under liquidation or bankruptcy; provide undertaking
Offer only items with at least 3 years residual market life
Submit PAN, GSTIN, cancelled cheque, and EFT mandate
Indian Army
SOLAN, HIMACHAL PRADESH
Indian Army
ANANTHNAG, JAMMU & KASHMIR
Indian Army
DEHRADUN, UTTARAKHAND
Indian Army
CHAMOLI, UTTARAKHAND
Indian Army
BARAMULLA, JAMMU & KASHMIR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Air Filter Outer | Air Filter Outer | 6 | nos | ketan.262h | 15 |
| 2 | Service Kit Water Pump | Service Kit Water Pump | 5 | nos | ketan.262h | 15 |
| 3 | Hose Assembly | Hose Assembly | 5 | nos | ketan.262h | 15 |
| 4 | Hose Assembly fuel tank to water separator | Hose Assembly fuel tank to water separator | 5 | nos | ketan.262h | 15 |
| 5 | Bolt Reamer | Bolt Reamer | 52 | nos | ketan.262h | 15 |
| 6 | Hyd Jack Cyl Service Kit | Hyd Jack Cyl Service Kit | 5 | nos | ketan.262h | 15 |
| 7 | Accelerator Cable Dozer | Accelerator Cable Dozer | 5 | nos | ketan.262h | 15 |
| 8 | Gaskt Exhaust front | Gaskt Exhaust front | 5 | nos | ketan.262h | 15 |
| 9 | Element Super Lub Oil bypass filter | Element Super Lub Oil bypass filter | 8 | nos | ketan.262h | 15 |
| 10 | Cover fule Pump | Cover fule Pump | 5 | nos | ketan.262h | 15 |
| 11 | Gasket water pump | Gasket water pump | 5 | nos | ketan.262h | 15 |
| 12 | Repair Kit fuel pump | Repair Kit fuel pump | 5 | nos | ketan.262h | 15 |
| 13 | Valve shut down | Valve shut down | 5 | nos | ketan.262h | 15 |
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of cancelled cheque
Copy of EFT Mandate certified by Bank
NON DISCLOSURE DECLARATION CERTIFICATE on bidder letterhead
Any OEM authorization or supplier certifications demonstrating non-obsolescence and market life
Technical compliance or design documents as required by buyer after award
Extended Deadline
02-Dec-2025, 10:00 am
Opening Date
02-Dec-2025, 10:30 am
Extended Deadline
29-Nov-2025, 2:00 pm
Opening Date
29-Nov-2025, 2:30 pm
Key insights about MANIPUR tender market
To bid, bidders must meet eligibility criteria, submit PAN and GSTIN, provide EFT mandate, and include a Non-Disclosure Declaration. Also ensure the items have a minimum 3-year residual market life and prepare Detailed Design Drawings within 5 days of award for approval.
Required documents include PAN, GSTIN, cancelled cheque, EFT mandate, and NDA certificate. OEM authorizations and technical compliance certificates should be supplied if applicable, plus any design drawings approved by the buyer. Ensure non-obsolescence and market-life compliance are demonstrated.
The option clause allows up to 25% quantity increase during contract execution. Delivery time adjusts proportionally with the increased quantity, with a minimum of 30 days additional time. Extended delivery starts from the last date of the original or extended delivery period.
Bidders must ensure products have at least 3 years residual market life and are not end-of-life as per OEM. No explicit IS or ISO standard is listed, but OEM alignment and non-obsolescence are mandatory for eligibility.
GST is the bidder’s responsibility. Reimbursement is provided at actuals or the applicable lower rate, subject to the quoted GST percentage. Vendors should calculate GST carefully and document the rate in the bid.
Within 5 days of award, submit Detailed Design Drawings forBuyer approval. The buyer will approve or list modifications within 5 days. Delays from buyer will not incur LD; delivery period may be refixed accordingly to accommodate drawing approval.
Access all tender documents at no cost
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS