1.5 TR Split AC,2.0 TR Split AC,Standard Installation of 5 star rating Inverter type 1.5_2.0 TR Spl
Indian Space Research Organization
AHMADABAD, GUJARATPosted 11 Jun
GEMGoods4 Documents
Category: 1.5 TR Split AC , 2.0 TR Split AC , Standard Installation of 5
star rating Inverter type 1.5_2.0 TR Split AC , Supply_laying
and connection of 2.5 sqmm 4 core electrical copper wire
and 1_4 copper refrigerant piping , Supply_laying and
connection of 2.5 sqmm 4 core electrical copper wire and
3_8 copper refrigerant piping , Supply_laying and
connection of 1_2 copper refrigerant piping , Supply_laying
and connection of 5_8 copper refrigerant piping ,
Supply_laying and connection of 3_4 copper refrigerant
piping , Dismantling of existing 1.5_2.0 TR Split AC , Supply
and installation of L Bracket_C channel stand , Supply and
Installation of 1_2 PVC Drain Pipe , Supply and installation of
1.5 TR Capacity Window Acs , Supply and installation of 2.0
TR Window Air conditioners in existing wooden frame ,
Supply and Installation of teak wood make double
rectangular window frame , Supply of ceiling mounting
type_cordless operated by remote 2.0 TR cassette AC ,
Supply of ceiling mounting type_cordless operated by
remote 4.0 TR cassette AC , Installation_testing and
commissioning_ 2.0TR_4.0 TR ceiling mounting cassette Air-
conditioning Indoor unit and Outdoor condensing Units ,
Supply and Installation of 3_4 insulated UPVC Drain Pipe ,
Supply of Microprocessor based factory fabricated Air cooled
outdoor condensing unit_Cooling capacity_3.0TR , Supply of
Microprocessor based factory fabricated Air cooled outdoor
condensing unit_Cooling capacity_5.5 TR , Supply of
Microprocessor based factory fabricated Air cooled outdoor
condensing unit_Cooling Capacity_8.5TR , Supply of
Microprocessor based factory fabricated Air cooled outdoor
condensing unit_Cooling Capacity_11.0TR ,
Installation_testing and commissioning of Outdoor
condensing Units_3.0TR , Installation_testing and
commissioning of Outdoor condensing Units_5.5TR ,
Installation_testing and commissioning of Outdoor
condensing Units_8.5TR , Installation_testing and
commissioning of Outdoor condensing Units_11.0TR ,
Supply and fixing of condenser mounting_Heavy
Duty_stand_ 3.0 TR_5.5 TR , Supply and fixing of condenser
mounting_double decker_stand_ 8.5TR_11.0TR
Deadline
9 Jul 2025