8 Port Web Managed PoE or PoE plus Switch with 2 SFP Port of reputed make acceptable by the Corpora
North Eastern Electric Power Corporation Limited
KOLASIB, MIZORAMPosted 8 Feb
GEMGoods4 Documents
Category: 8 Port Web Managed PoE or PoE plus Switch with 2 SFP Port
of reputed make acceptable by the Corporation , 24 Port
Web Managed PoE or PoE plus Switch with 2 or 4 SFP Port of
reputed make acceptable by the Corporation , 9U Network
Rack of reputed make acceptable by the Corporation , 12U
Network Rack of reputed make acceptable by the
Corporation , 3KVA Online UPS with One hour Battery
Backup of reputed make acceptable by the Corporation ,
1KVA Online UPS with One hour Battery Backup of reputed
make acceptable by the Corporation , 5MP Indoor Color IR
Dome Camera of reputed make acceptable by the
Corporation , 5MP Outdoor Long distance 80 Meters IR
Optical Zoom Bullet Camera of reputed make acceptable by
the Corporation , 8 Channel Network Video Recorder with 2
SATA Slot of reputed make acceptable by the Corporation ,
32 Channel Network Video Recorder with 2 SATA Slot of
reputed make acceptable by the Corporation , 24 Port Patch
Panel for STP Cat6 cable of reputed make acceptable by the
Corporation , 10 TB Surveillance HDD of reputed make
acceptable by the Corporation , Cat 6 Patch Cord of reputed
make acceptable by the Corporation , Six cores Optical
Fiber armoured Cable Single Mode of reputed make
acceptable by the Corporation , STP CAT6 RJ45 6A
Connector of reputed make acceptable by the Corporation ,
1G SFP Transceiver module of reputed make acceptable by
the Corporation , UPS Battery Rack with accessories of
reputed make acceptable by the Corporation , OFC Clamp
with screws, bolts, etc required for stringing in the poles of
reputed make acceptable by the Corporation , STP Cat6
cabling laying charge , Laying charge of pipe or casing. ,
Laying and termination charge of Optic Fiber Cable at LIU
along with its accessories. , Installation, testing and
Commissioning work for CCTV IP Surveillance System
including Training
Deadline
24 Feb 2025