TenderDekho Logo
Battery Adapter And Accessories state-wide in Andaman & Nicobar

Battery Adapter And Accessories Tenders in Andaman & Nicobar

Explore state-wide battery adapter and accessories procurement opportunities in Andaman & Nicobar. Track active bids, eligibility criteria, and deadlines for this state.

Location
Authority
0

Ordinary Ceiling fan 1200 mm sweep Orient-Crompton-Philips-Usha,1.0 HP Electrical water Pump,HEAVY

Andaman Lakshadweep Harbour Works (alhw)

NICOBARS, ANDAMAN & NICOBARPosted 13 Feb
GEMGoods3 Documents
Category: Ordinary Ceiling fan 1200 mm sweep Orient-Crompton- Philips-Usha , 1.0 HP Electrical water Pump , HEAVY DUTY BATTERY CHARGER Specification- Main Supply - 230V AC, 50 Hz Battery Volts - 6 to 72 Volts Battery AH - 100 to 400 AH Charging current - 10 to 30 Amps Transformer , PORTABLE WELDING MACHINE Specification- Input Power- 220V, 50 Hz Input Capacity- 6.1 KVA , TUBE VULCANIZING MACHINE Specification- Voltage- 220V AC Power- 500 to 1000 Watt
Deadline
6 Mar 2025
View Details

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C 412; L127 S

Indian Coast Guard

SOUTH ANDAMANS, ANDAMAN & NICOBARPosted 19 Mar
GEMService4 Documents
Category: Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C 412; L127 Ships Portable battery charger is nonoperational not generating rated output On DI observed that transformer winding is burned out and nil output from r.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C 412; L113 During PME operation it was observed that PME dynamo was unable to provide charging voltage to the starting batteries view suspected dynamo malfunctioni.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C 412; E115 Starting arrangement of emergency Diesel Driven pump 40TPH not working and up rooted from the base due to material ageing Overhauling of pump to be carr.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C 412; H11 Base frame and securing stand of both main engine starting battery deteriorated due to material ageing Base frame to be fabricated as per sample Mat Alum.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C 412; H17 Base frame securing stand of both DA starting battery and GMDSS batteries at flag deck is deteriorated due to material ageing Base frame to be fabricated..
Deadline
26 Mar 2025
View Details

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - HC 546; HB 1004 En

Indian Coast Guard

SOUTH ANDAMANS, ANDAMAN & NICOBARPosted 1 May
GEMService4 Documents
Category: Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - HC 546; HB 1004 Entire superstructure Area 50Sqmtr to be painted as per paint scheme including area above water line to be painted using Ms Akzonoble makes paint Wanda 2.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - HC 546; HB1005 Renew rubber beading of 03 in nos water tight doors and 02 hatch and chalk test to be carried out Material yard supply Beading Mat EPDM rubber length 1.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - HC 546; HA 1006 Door and hatches 03 Nos Hatches and 03 Nos doors holding arrangement of Bridge Crew cabin DA Compartment Engine room compartment and boatswain store defe.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - HC 546; HB 1008 Clean the bilges of main engine DA compartment Boatswain store and night Cabin Void space thoroughly inspect the structure to main engine foundation for .. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - HC 546; HB 1012 Wooden panelling of Bulkhead including lane at Crew cabin Bridge and Wc area deformed uprooted Same to be renewed as per samples Mat fire proof plywood A.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - HC 546; HB 1020 Entire inner compartment wood polishing to be carried out for smoothness MatYard supply All in way jobs included; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - HC 546; EA 3003 Following job to be carried out in AC system Post completion of jobs AC plant to be proved for satisfactory operation and performance a Overhaul sea wat.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - HC 546; EA 3011 GEAR BOX 02 NOS Make Twin Disc Model MG 5082A Ratio 2 05 1 Following jobs to be carried out in both Gear Boxes : Mat/Spares yard supply a Retighte.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - HC 546; EA 3007 MOTOR DRIVEN FIRE PUMP Make Flow Chem Model FPE SJ 40 110 Following jobs to be carried out in Fire pump System Mat Spares yard supply a Overhau.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - HC 546; LA 5001 MAIN SWITCH BOARD 03 NOS Clean all contacts with CTC and overhaul the complete 03 Nos Main switch boards general 230V AC 24V DC Main Navigation Panel D.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - HC 546; LA-5002 EXHAUST FANS 03 NOS Make Crompton Greaves Model CGFA233514S3 02 No 075 Kw CGFA232014S1 01 No 1 Kw Exhaust fans 03 Nos overhaul motors and replace beari.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - HC 546; LA 5004 BATTERY CHARGER 02 NOS Overhaul the battery chargers renew defective components Calibrate 01 in No Ammeter and provide calibration certificate Material.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - HC 546; LA 5014 FIRE DETECTION SYSTEM ZEAL MARKETING Overhaul the main unit, check the functionality of all sensors Heat detector 03 Nos Smoke detector 02 Nos Manual cal..
Deadline
7 May 2025
View Details

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-418; H 076

Indian Coast Guard

SOUTH ANDAMANS, ANDAMAN & NICOBARPosted 20 May
GEMService4 Documents
Category: Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-418; H 076 Wooden panelling in bridge is deteriorated and water leakage observed at various places Same to be fabricated and renewed as per sample All in way jobs.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-418; H 077 02 in nos water jet platform net has been deteriorated and broken in between Same to be fabricated as per sample Mat Aluminium; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-418; H 078 Underlay top and sealant coat is to be applied on AC STP compartment deck plate to be protect from erosion oxidation of aluminium plate from direct con.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-418; E 095 01 in no OBM overhauled to be carried out includes checks corrosion and deformation of anode and trip lub Replace if necessary adjust ignition timing C.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-418; E 096 Checker plates are damaged and broken in engine room and waterjet compartment at various places Same to be renewed Area 08 sqr mtr; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-418; E 098 Cleaning and inspection of hydrophore tank test to be carried out and certified; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-418; E 099 AC compartment bulkhead lagging deteriorated and perished Same to be renewed as per sample Area 05 Sqr mtr; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-418; L 102 Battery charger unit 1 not working in auto node Defect to be rectified and proved for satisfactory operation; Service Provider
Deadline
2 Jun 2025
View Details
Chat with us