Supply of Telephone junction Box MDF 100 pair fully loaded with krone module and required accessori
Ans,finance,hr,engineering,tech,ops,commercial,general Store,it
BHOPAL, MADHYA PRADESHPosted 13 Jun
₹10.9 L
EMD: ₹21,885
GEMGoods4 Documents
Category: Supply of Telephone junction Box MDF 100 pair fully loaded with krone module and required accessories for wall mount installation , Supply of Telephone junction Box MDF 50 pair fully loaded with krone module and required accessories for wall mount installation , Supply of Telephone junction Box MDF 20 pair fully loaded with krone module and required accessories for wall mount installation , Supply of CAT 6 UTP Cable in 305 Mtr packing box , Supply of RJ 11 Input Output Module Box with RJ11 Keystone jack , Supply of RJ 11 Connector , Supply of 1 pair copper telephone patch cord of 3 meter with RJ 11 connectors at both ends , Supply of RJ 11 Rosette Box , Supply of FXS Gateway having capability of 16 Analog extensions with termination of 16 pair telephone lines. , Supply of 0.5mm Armoured 10 Pair JFC Cable , Supply of 0.5mm Armoured 5 Pair JFC Cable , Supply of Telephone Line Surge Protector 1 pair module , Supply of 06 Core Armoured Optical Fibre Cable , Supply of OFC 12 port LC Line Interface Unit LIU Panel fully loaded , Supply of Full Duplex LC-LC OFC Patch Cord 1mtr. , Supply of Layer-2 Switch 8 Port 10, 100, 1000 Base T with 2X1G SFP ports fully loaded with SFP transceiver 10 KM , Supply of 4 inch dia GI Pipe , Supply of 40 mm dia HDPE Pipe , Supply of 300mm wide Perforated Cable Tray , Supply of 25mm Casing Caping , Supply of 25mm Flexible Pipes , Supply of 25mm PVC Conduit Pipes , Supply of 8 inch Cable Tie 100 Pieces , Supply of 10 inch Cable Tie 100 Pieces , Supply of 15 inch Cable Tie 100 Pieces , Charges for Laying of HDPE pipes via existing Hume Pipes,trench,duct,cable tray etc and punching on the wall with saddle clamp fitting. Approx 100 meter for wall punch. , Laying or pulling charges of OFC Cable via HDPE Pipe and conduit procured in this bid, Installation of LIU and termination of OFC to LIU at all ends , Splicing Charges for single core , SITC Charges for System
Deadline
4 Jul 2025