Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C 428; E095 A
Indian Coast Guard
SOUTH ANDAMANS, ANDAMAN & NICOBARPosted 21 Feb
GEMService4 Documents
Category: Repair, Maintenance, and Installation of Plant/
Systems/Equipments (Version 2) - ICGS C 428; E095
Abnormal noise observed from AHU compartment of AC
plant DIDR carried out by ship staff suspect bearings are
worn out Following jobs to be undertaken a.. , Repair,
Maintenance, and Installation of Plant/ Systems/Equipments
(Version 2) - ICGS C 428; E096Fire and General Service
pump Discharge valve not holding Valve to be
repairedOverhauled and proved for satisfactory operation
Size 65 NB; Service Provid.. , Repair, Maintenance, and
Installation of Plant/ Systems/Equipments (Version 2) - ICGS
C 428; E097Lub oil leakage observed from Stbd DA oil drain
pipe line Pipe line to be renewedfabricated as sample In way
jobs opening of old pipe and fitment of new .. , Repair,
Maintenance, and Installation of Plant/ Systems/Equipments
(Version 2) - ICGS C 428; E099Copper line of pressure
gauges of following pumps Fire and Bilge pump KFWA pump
FWater pump uprootedpin hole same to be renewed as per
sample along with .. , Repair, Maintenance, and Installation
of Plant/ Systems/Equipments (Version 2) - ICGS C 428;
E100Sea water leakage observed view multiple pin holes
from AC system pipe line Pipe line to be fabricatedrenewed
All inway job include removal of fitted pip.. , Repair,
Maintenance, and Installation of Plant/ Systems/Equipments
(Version 2) - ICGS C 428; E101Hydraulic door closure for
Water jet entrance door uprooted and door closure to be
repaired fitment of the same with suitable fastners to be
carried out .. , Repair, Maintenance, and Installation of Plant/
Systems/Equipments (Version 2) - ICGS C 428; E102Anti rust
coating of both shaft from gear box to bulk head area were
peeled off antirust coat to be applied on both shaftLength
04 Mtr; Service Provider , Repair, Maintenance, and
Installation of Plant/ Systems/Equipments (Version 2) - ICGS
C 428; E103Low air flow and ice formation observed on
evaporator coil and air not cooling as per requirement of AC
plant DI carried out by SS and found evaporator c..
Deadline
27 Feb 2025