TenderDekho Logo
Boiler Work state-wide in Uttar Pradesh

Boiler Work Tenders in Uttar Pradesh

Access live Boiler Work procurement tenders in Uttar Pradesh state

Location
Authority
0

Custom Bid for Services - MRCC24A053 Expert service of Ms Bharat Heavy Electricals Limited for CO f

Indian Oil Corporation Limited

MATHURA, UTTAR PRADESHPosted 24 Dec
GEMService13 Documents
Category: Custom Bid for Services - MRCC24A053 Expert service of Ms Bharat Heavy Electricals Limited for CO fired boiler tube replacement at Mathura Refinery Line 10 Charges of expert service for 08 hours on normal working days , Custom Bid for Services - MRCC24A053 Expert service of Ms Bharat Heavy Electricals Limited for CO fired boiler tube replacement at Mathura Refinery Line 20 Overtime charges of expert after 08 hours on normal working days and on Sunday holiday , Custom Bid for Services - MRCC24A053 Expert service of Ms Bharat Heavy Electricals Limited for CO fired boiler tube replacement at Mathura Refinery Line 30 To Fro travel from the Point of Origin to Delhi airport and return As per actual on submissio..
Deadline
28 Feb 2025
View Details

Uttar Pradesh Cooperative Sugar Factories Federation Limited Bagasse Carrier & Boiler Structural Repair Tender Saharanpur 2026

N/a

SAHARANPUR, UTTAR PRADESHPosted 27 Jun
₹3.3 L
GEMGoods5 Documents
Category: Remove the worn out runners from the main bagasse carrier bagasse elevator and return bagasse carrier errect 8x65 10x50 mm flat iron bars in their place clean the welded areas using a grinder , Cut and remove the worn out bottom plates of the main bagasse carrier bagasse elevator and return bagasse carrier errect new 6 8 10 mm , Cut and remove the worn out side plates of the main bagasse carrier bagasse elevator and return bagasse carrier errect 6 8 10 mm plates satisfactory trial run , Cut out and remove the damaged and weak sections of the main bagasse carrier fabricate and errect a new assembly including the gear shaft system using the supplied plate , Cut out and remove the weak and corroded sections of the bagasse feeding chutes errected boilers fabricate and replacements using the provided plates and repair the associated shafts and gears , The casings of the boiler ID and FD fans have become severely weakened and damaged The task involves cutting away and removing the weakened sections fabricating , Cut and remove the deteriorated side bottom and top plates surrounding the air heater of Boiler No. 3 fabricate and errect new plates using the specified 6 8 mm plate in their original positions , Fully strengthen the air heater plates and conduct a satisfactory trial. , Dismantling the old air heater tubes of Boiler No. 01 size 63.5 mm OD x 2.64 mm thickness fabricating and errecting new tubes in accordance with the drawing , Dismantling the old air heater tubes of Boiler No. 02 size 63.5 mm OD x 2.64 mm thickness fabricating and errecting new tubes in accordance with the drawing , Dismantling the old air heater tubes of Boiler No. 03 size 63.5 mm OD x 2.64 mm thickness fabricating and errecting new tubes in accordance with the drawing , a. Dismantling old columns beam channels etc. B. Manufacturing and installing new columns beam channels , Installing 16 inch 18 inch manholes with blinds , Constructing a bed for the pump fitting the pump and motor and conducting a trial run of up to Twenty HP , Dismantling fabricating and erecting weak corroded pipe lines up to 12 and providing satisfactory leak proof trials. , Dismantling fabricating and erecting weak corroded tees up to 12 and providing satisfactory leak proof trials. , Dismantling fabricating and erecting weak corroded nipples up to 12 and providing satisfactory leak proof trials. , Dismantling fabricating and erecting a weak throated cross member up to 12 and providing satisfactory leak proof trials. , Dismantling fabricating and erecting a weak throated band up to 12 and providing satisfactory leak proof trials. , Dismantling fabricating and erecting a weak throated flange up to 12 and providing satisfactory leak proof trials. , Dismantling fabricating and erecting a weak sloping reducer up to 12 and providing a satisfactory leak proof trial. , Removing the old corroded platform and replacing it with a new one
Deadline
13 Jul 2026
View Details