Repair and replacement work of two radial gates (4.00 m × 4.50 m each) at the escape structure at Ch. 26.943 km of the Narmada Main Canal, including dismantling of existing components and fabrication, erection, painting of new gate assemblies comprising gate leaf assembly, girders, arms, lifting brackets, rope sockets, wire ropes, rubber seals, and embedded parts (trunnion bracket assemblies) along with lowering and raising of stop-logs.
Executive Engineer, N. P. M. C. Mechanical Division, Gandhinagar