Material and Labour for conducting soil investigation by drilling boreholes dia 150 mm and depth 06
Indian Army
VADODARA, GUJARATPosted 5 May
GEMGoods3 Documents
Category: Material and Labour for conducting soil investigation by
drilling boreholes dia 150 mm and depth 06 point 0m or at
which further boring is restricted refusal , Material and
Labour for Preparing trial pit size 1 point 20 m into x 1 point
20 m 5 point 00m away from BH Both centrally placed upto
depth , Following parameters will form part of the Soil
investigation report to be submitted by the consultants , A
detailed site plan showing the outline of the proposed
building and approx location of each bore hole duly
numbered as per log of bore hole should be enclosed
Location of foundation , Conducting field california bearing
Ratio as per IS 2720 Part31 1995 CBR is the ratio of force
per unit area required to penetrate soil mass with a
standard circular piston