RE- WIRING, CABELING, CONDUTING INCLUDING DB WITH MAIN LINE TERMINATION FOR THE ENTIRE OFFICE,INSTA
Society For Applied Microwave Electronic Engineering And Research (sameer)
MUMBAI, MAHARASHTRAPosted 12 Mar
GEMGoods4 Documents
Category: RE- WIRING, CABELING, CONDUTING INCLUDING DB WITH
MAIN LINE TERMINATION FOR THE ENTIRE OFFICE ,
INSTALLATION OF CONCEALED LIGHTS FITTINGS LIKE SPOTS
, PANEL LIGHTS , LED STRIP LIGHTS ETC. FOR THE ENTIRE
OFFICE. , PROVIDING AND FIXING GYPSUM CEILING ON
GYPROX GYPSUM CHANNEL WITH NECESSARY TAPES AND
JOINT FILLING. , LIGHT GALA CUTTING , GROOVING WHERE
NEEDED IN WHOLE OFFICE , PROVIDING AND FIXING POP
WALL PUNNING WHEREVER NEEDED , PROVIDING AND
APPLYING PAINT ON CEILING , PROVIDING AND APPLYING
WALL PAINT , POLISHING OF DOOR AND ENTIRE OFFICE
WHEREVER NEEDED , BREAKING OF EXISTING GLASS
PARTITION WALLS , PROVIDING AND MAKING BRICK WALL
WITH NEAR SAMINAR HALL , PROVIDING AND MAKING BRICK
WALL WITH TECHNOLOGY ARENA WALL , PROVIDING AND
MAKING BRICK WALL WITH MEDIA AREA WALL , FLOOR
PROTECTION SHEET FOR THE ENTIRE OFFICE TO COVER
EXISTING FLOORING DURING EXECUTION OF WORK ON SITE
, RABBIT WASTE REMOVING , DEEP CLEANING OF THE
OFFICE , PROVIDING AND FIXING OF DOOR FINISHED IN
LAMINATE , REFURBISHING OF PASSAGE ENTRANCE DOOR ,
PROVIDING AND FIXING OF STORY WALL AS PER DESIGN ,
PROVIDING AND FIXING OF CEILING PANELING AS PER
DESIGN , PROVIDING AND FIXING OF PARTITION WALL
FINISHED IN LAMINATE AND PANEL AS PER DESIGN ,
PROVIDING AND MAKING OF STAIRCASE RAMP FOR SEATING
, PROVIDING AND FIXING OF SIDE STORAGE UNIT FINISHED
IN LAMINATE , PROVIDING AND FIXING BACK WALL
PANELING FINISHED IN LAMINATE AS PER DESIGN ,
PROVIDING AND FIXING PC UNIT FINISHED IN LAMINATE AS
PER DESIGN , PROVIDING AND FIXING LED SCREEN WALL
PARTITION WALL , PROVIDING AND FIXING WALL PANELING
WALL FINISHED IN FABRIC , PROVIDING AND FIXING
WINDOW PARTITION WALL AS PER DESIGN , PROVIDING
AND FIXING PASSAGE AREA PARTITION WALL AS PER
DESIGN , PROVIDING AND FIXING WALL PARTITION FOR
DISPLAY PODS AS PER DESIGN , CARPET FOR WHOLE AREA
Deadline
2 Apr 2025