TenderDekho Logo
Distribution Network state-wide in Bihar

Distribution Network Tenders in Bihar

Access live Distribution Network procurement tenders in Bihar state. Top buyer: GAIL (India) Limited. Combined opportunity value of ₹3.6 lakh. Key locations: Patna

Location
Major Buyer
0

Design, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Removal Treatment Plant having Technology (Adsorption/ Nano Technology) of CSIR or certified by CSIR or any other Technology endorsed/ approved by GoI in the Fluoride affected Habitations/ Wards of Districts of Bihar on turn-key basis with 3 months Trial Run after Commissioning and Comprehensive Operation and Maintenance of 60 months after successful completion of Trial Run Period under Mukhmantri Nishchay (Quality Affected) Yojna on Turn Key basis for Under P.H. Division, Munger Ward NO- 3, 4, 11, 13 of Panchayat- Banhara of under Block-Tetia Bambor, Dist-Munger. (Total no of Shceme-4)

Organization Not Specified

BIHARPosted 25 Aug
₹1.7 Cr
EMD: ₹3.5 L
EPROCURE-BIHAR5 DocumentsOpen
Deadline
2 Sept 2020
View Details

Design, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Removal Treatment Plant having Technology (Adsorption/ Nano Technology) of CSIR or certified by CSIR or any other Technology endorsed/ approved by GoI in the Fluoride affected Habitations/ Wards of Districts of Bihar on turn-key basis with 3 months Trial Run after Commissioning and Comprehensive Operation and Maintenance of 60 months after successful completion of Trial Run Period under Mukhmantri Nishchay (Quality Affected) Yojna on Turn Key basis for Under P.H. Division, Munger Ward NO- 10 (A), 10 (B), 11 (A), 11 (B) of Panchayat- Gangta of under Block-Haweli Khragpur, Dist-Munger. (Total no of Shceme-4)

Organization Not Specified

BIHARPosted 25 Aug
₹1.7 Cr
EMD: ₹3.4 L
EPROCURE-BIHAR5 DocumentsOpen
Deadline
2 Sept 2020
View Details

SELECTION OF AGENCY For SUPPLY, INSTALLATION, MAINTENANCE AND MANAGEMENT OF IOT ENABLED SOLUTION WITH SENSORS AND IOT CONTROL UNIT FOR REAL TIME MONITORING OF THE FUNCTIONALITY OF DRINKING WATER SUPPLY SCHEMES ON DASHBOARD INCLUDING REPORTING AND ALERT FEATURES AND 5 YEARS OPERATION AND MAINTENANCE IN DIFFERENT URBAN LOCAL BODIES (ULBs)/ URBAN DEVELOPMENT DIVISIONS UNDER URBAN DEVELOPMENT AND HOUSING DEPARTMENT (UD & HD), GOVT. OF BIHAR

Organization Not Specified

BIHARPosted 30 Dec
EMD: ₹8.3 L
EPROCURE-BIHAR5 DocumentsOpen
Deadline
10 Jan 2021
View Details

Design, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Removal Treatment Plant having Technology (Adsorption/ Nano Technology) of CSIR or certified by CSIR or any other Technology endorsed/ approved by GoI in the Fluoride affected Habitations/ Wards of Districts of Bihar on turn-key basis with 3 months Trial Run after Commissioning and Comprehensive Operation and Maintenance of 60 months after successful completion of Trial Run Period under Mukhmantri Nishchay (Quality Affected) Yojna on Turn Key basis for Under P.H. Division, Munger Ward NO- 10 (A), 10 (B), 11 (A), 11 (B) of Panchayat- Gangta of under Block-Haweli Khragpur, Dist-Munger. (Total no of Shceme-4)

Organization Not Specified

BIHARPosted 9 Feb
₹1.7 Cr
EMD: ₹3.4 L
EPROCURE-BIHAR7 DocumentsOpen
Deadline
16 Feb 2021
View Details

Design, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Removal Treatment Plant having Technology (Adsorption/ Nano Technology) of CSIR or certified by CSIR or any other Technology endorsed/ approved by GoI in the Fluoride affected Habitations/ Wards of Districts of Bihar on turn-key basis with 3 months Trial Run after Commissioning and Comprehensive Operation and Maintenance of 60 months after successful completion of Trial Run Period under Mukhmantri Nishchay (Quality Affected) Yojna on Turn Key basis for Under P.H. Division, Munger Ward NO- 3, 4, 11, 13 of Panchayat- Banhara of under Block-Tetia Bambor, Dist-Munger. (Total no of Shceme-4)

Organization Not Specified

BIHARPosted 9 Feb
₹1.7 Cr
EMD: ₹3.5 L
EPROCURE-BIHAR5 DocumentsOpen
Deadline
16 Feb 2021
View Details

Design and Construction of drinking water supply scheme of Aurangabad Nagar Parishad under AMRUT and state plan Scheme (Phase II) with six months of Trial run and thereafter operation and maintenance of system for next five years. (A) Construction of Elevated Service reservoir (ESR)/OHT-7 Nos., of different capacities ranging from 450 KL to 1350 KL having office room and toilet with water supply arrangement at ground below the tank DI/CI/HDPE Distribution Network 96.68 km, providing house service connection-1400 Nos. (B) Construction of High Yielding Tubewell-12 Nos., Raw Water Pump-1 set, Approach road-779.90 M (for CWR, ESR), Clear Water Pipe Line (CWR at Barun-20.10 km, (600 mm dia DI k9 Pipe), Construction of Gangway-1 set (3000m long 1 m wide), Lifting Arrangement 2 set, Chlorinator (200L)-1 No., Construction of Chlorinator room 1 No., Stand Post-20 Nos., Master Elevated Reservoir-1 No. (1270 KL), having office room and toilet at ground floor below tank area Intermediate Pumping Station-3 Nos., (Zone-III, Zone-V, Zone VI), Clear Water reservoir-1 No. at Barun (1340 KL), Clear Water Pump-1 Set, Clean Water Pumping Main-630 M (250mm dia, 600mm dia), Clear Water Gravity Main-12.012 km (250mm dia, 750mm dia), DI/CI/HDPE Distribution Network 77.81 km (Zone I, III & IV), House Service Connection-8340 Nos., SCADA System-8 Nos.

Organization Not Specified

BIHARPosted 24 Nov
EMD: ₹1.5 Cr
EPROCURE-BIHAR7 DocumentsOpen
Deadline
29 Dec 2022
View Details

Construction of water supply scheme (phase-II) of Aurangabad Nagar Parishad under AMRUT and state plan Scheme with operation & maintenance work for five years, with - (A) Construction of Elevated Service reservoir (ESR)/OHT-7 Nos., Distribution Network 96.68 km, Service connection-1400 Nos. (B) Construction of High Yielding Tubewell-12 Nos., Raw Water Pump-1 set, Approach road-779.90 M (for CWR, ESR), Clear Water Pipe Line (CWR at Barun-20.10 km, (600 mm dia DI k9 Pipe), Construction of Gangway-1 set (3000m long 1 m wide), Lifting Arrangement 2 set, Chlorinator (200L)-1 No., Construction of Chlorinator room 1 No., Stand Post-20 Nos., Master Elevated Reservoir-1 No. (1270 KL), having office room and toilet at ground floor below tank area Intermediate Pumping Station-3 Nos., (Zone-III, Zone-V, Zone VI), Clear Water reservoir-1 No. at Barun (1340 KL), Clear Water Pump-1 Set, Clean Water Pumping Main-630 M (250mm dia, 600mm dia), Clear Water Gravity Main-12.012 km (250mm dia, 750mm dia), DI/CI/HDPE Distribution Network 77.81 km (Zone I, III & IV), House Service Connection-8340 Nos., SCADA System-8 Nos.

Organization Not Specified

BIHARPosted 15 Apr
₹1
EMD: ₹1.5 Cr
EPROCURE-BIHAR6 DocumentsOpen
Deadline
16 May 2023
View Details