Dismantling of old worn out acoustic treated false ceiling facing material, shifting and disposal o
Prasar Bharati Broadcasting Corporation Of India
AGRA, UTTAR PRADESHPosted 13 May
₹26.6 L
EMD: ₹53,252
GEMGoods4 Documents
Category: Dismantling of old worn out acoustic treated false ceiling
facing material, shifting and disposal of dismantled debris
material from outside of the office premises at Akashvani
Agra, Uttar Pradesh , Providing, fabrication and fixing of
false ceiling facing material in transmission booth studio,
control room, talk studio and other technical area at
Akashvani Agra, Uttar Pradesh , Dismantling of old worn out
wooden acoustic treated wall panelling facing material,
shifting and disposal of dismantled debris material from
outside of the office premises at Akashvani Agra, UP ,
Providing, fabrication, fixing of A and B type wooden wall
paneling facing material including wainscot in transmission
booth, control room, talk studio and other technical area at
Akashvani Agra , Providing, fabrication and fixing of cedar
or teak wooden skirting 125mm x 13mm in transmission
booth studio, control room, talk studio and other technical
area at Akashvani Agra, UP , Anti Termite treatment to
ensure uniform distribution and proper penetration of
treatment of treating solution as required in transmission
booth, control room, talk studio and other technical area ,
Providing, applying 2 coats of wall primer on gypsum false
ceiling and walls,after touching on corners,joints and screw
heads at transmission booth, control room, talk studio and
other technical area , Wooden surface to be cleaned and
wooden putty to be applied and after rubbing with
appropriate sand paper to smooth the surface two or more
coat of wooden polish to be applied in wainscot and doors ,
Providing and applying of wall finish, putty and POP on walls
to make smooth finish for premium emulsion paint at
transmission booth studio, control room, talk studio and
other technical area , Providing, applying of
125mmx125mmx12mm POP Gypsum cornice as per
approved profile at all around false ceiling in transmission
booth studio, control room, talk studio and technical area ,
Fixing of 2ftx2ft recessed LED light fixtures, as per
respective drawings with supply of 1.5 Sq.mm single core
copper cable with laying and wiring of recessed mounted
LED light and make ready
Deadline
4 Jun 2026