Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-418; H 076
Indian Coast Guard
SOUTH ANDAMANS, ANDAMAN & NICOBARPosted 20 May
GEMService4 Documents
Category: Repair, Maintenance, and Installation of Plant/
Systems/Equipments (Version 2) - ICGS C-418; H 076
Wooden panelling in bridge is deteriorated and water
leakage observed at various places Same to be fabricated
and renewed as per sample All in way jobs.. , Repair,
Maintenance, and Installation of Plant/ Systems/Equipments
(Version 2) - ICGS C-418; H 077 02 in nos water jet platform
net has been deteriorated and broken in between Same to
be fabricated as per sample Mat Aluminium; Service
Provider , Repair, Maintenance, and Installation of Plant/
Systems/Equipments (Version 2) - ICGS C-418; H 078
Underlay top and sealant coat is to be applied on AC STP
compartment deck plate to be protect from erosion
oxidation of aluminium plate from direct con.. , Repair,
Maintenance, and Installation of Plant/ Systems/Equipments
(Version 2) - ICGS C-418; E 095 01 in no OBM overhauled to
be carried out includes checks corrosion and deformation of
anode and trip lub Replace if necessary adjust ignition
timing C.. , Repair, Maintenance, and Installation of Plant/
Systems/Equipments (Version 2) - ICGS C-418; E 096
Checker plates are damaged and broken in engine room and
waterjet compartment at various places Same to be
renewed Area 08 sqr mtr; Service Provider , Repair,
Maintenance, and Installation of Plant/ Systems/Equipments
(Version 2) - ICGS C-418; E 098 Cleaning and inspection of
hydrophore tank test to be carried out and certified; Service
Provider , Repair, Maintenance, and Installation of Plant/
Systems/Equipments (Version 2) - ICGS C-418; E 099 AC
compartment bulkhead lagging deteriorated and perished
Same to be renewed as per sample Area 05 Sqr mtr; Service
Provider , Repair, Maintenance, and Installation of Plant/
Systems/Equipments (Version 2) - ICGS C-418; L 102 Battery
charger unit 1 not working in auto node Defect to be
rectified and proved for satisfactory operation; Service
Provider
Deadline
2 Jun 2025