2MP or Higher PTZ IP Cameras,2MP PTZ IP Fibre in out Cameras,2MP IP Bullet cameras,2MP IP Fixed Dom
Airports Authority Of India
CHENNAI, TAMIL NADUPosted 8 Apr
₹20.4 Cr
EMD: ₹61.2 L
GEMGoods3 Documents
Category: 2MP or Higher PTZ IP Cameras , 2MP PTZ IP Fibre in out
Cameras , 2MP IP Bullet cameras , 2MP IP Fixed Dome
Cameras , 5MP IP Bullet cameras for ANPR , 5MP IP Dome
cameras for Face recognition , Manageable switch with 24
Nos 1G Transceiver fully loaded , 24 Port POE plus Managed
Switch 4 SFP Ports populated with 1G transreceivers , 24
Port POE plus Managed Switch 4 SFP Ports populated with
10G transreceivers , Managed 24 Port 1G SFP Fiber Network
Switches with 1G Transceivers fully populated , Industrial
Grade Managed Switch 8 Port POE plus 4 SFP Slots , IP 55
500W x 4U x 500D Size outdoor Junction Box with Pole
Mount including power accessories , IP 55 600W
X12UX600D Size outdoor Junction Box , IP 55 22U Size Floor
mount outdoor Junction Box , 12 core Single mode outdoor
OFC cable , 48 core Single mode outdoor OFC cable , 12
port LIU fully loaded LC Duplex Adaptor , 48 port LIU fully
loaded LC Duplex Adaptor , SM OFC Patch cord LC LC ,
Outdoor CAT6 UTP , Indoor CAT6 UTP , FRLS Armoured 3
Core Two point Five Sqm Power cable , FRLS Armoured 3
Core 4 Sqm Power cable , 2 meters Galvanised Pole , 3
meters Galvanised Pole , 5 meters Galvanised Pole , 25 mm
Heavy Duty Electrical PVC Pipe , 4 inch Diameter Galvanised
Pipe , HDPE 50 mm pipe , Rack mount 1KVA Online UPS with
30 Minutes Backup with Accessories , Installation of
Cameras Sl 1 to 6 , Installation Configuration of Network
Switches , Installation of 4U Out Door Pole Mount Junction
Box , Installation of 12U 22U Out Door Floor Mount Junction
Box Sl Nos 13 14 , Laying of OFC Cable Out Door In Door
Cat 6 UTP Cable Armoured , Installation of 2Mtr
3MtrGalvanised Pole Sl Nos 25 to 26 as per Site
Requirement , Installation of 5Mtr Galvanised Pole Sl No 27
as per Site Requirement , Laying of 25mm Heavy duty
Electrical PVC pipe , Laying of 50mm HDPE pipe on wall
ceiling pole as per site requirements , Laying of 4 inch
Diameter Galvanised Pipe including by road cutting , Earth
work Excavation of soft soil hard soil , Testing Training
Documentation and Commissioning , Operation and
Maintenance , Fourth Year CAMC , Fifth Year CAMC , Sixth
Year CAMC
Deadline
6 May 2025