Opening of transformer cover draining oil de-tanking core-coil assembly Assessment and estimation f
Indian Council Of Agricultural Research (icar)
BAREILLY, UTTAR PRADESHPosted 15 Apr
EMD: ₹17,000
GEMGoods4 Documents
Category: Opening of transformer cover draining oil de-tanking core-
coil assembly Assessment and estimation for repair and
replacement of parts providing locking arrangement of all
valves and plugs , Loading and unloading of transformer at
side CPH and Firms work premises hiring , HV leg coil with
insulation varnish and baking of coil assembling vacuum ,
LV leg coil with insulation varnish and baking of coil
assembling vacuum impregnation New EC grade Copper
with insulation , Set of gaskets rubberized cork neoprene
material and size is needed for HV and LV , Breather
dehydrator Silica gel type with fresh silica gel 01 kg , Fresh
transformer oil of standard quality as per the ISI mark for
main tank and OLTC , Double float Buchholz relay including
all accessories , Air release valve including all accessories if
required , Magnetic oil gauge including all accessories if
required , Radiator valve including all accessories if required
, Reassembling of 3 15 MVA transformer Dyn 11 star Delta
connected with proper size of copper strip , Replacement
change of complete Gaskets rubberized cork neoprene
material , The OLTC was completely repaired with the
replacement , Painting charges of transformer tank having
hot oil resistant paint inside and synthetic enamel paint on
transformer after cleaning of tank and complete painting
outside etc as reqd. , Less the cost of old and burned
transformer Oil plus old transformer Oil of OLTC , Less the
cost of old and dismantling insulated copper
Deadline
6 May 2026