TenderDekho Logo
Heat Transfer Oil state-wide in Andaman & Nicobar

Heat Transfer Oil Tenders in Andaman & Nicobar

Explore state-wide heat transfer oil procurement opportunities in Andaman & Nicobar. Track active bids, eligibility criteria, and deadlines for this state.

Location
Authority
0

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS RAJKIRAN; E 3

Indian Coast Guard

SOUTH ANDAMANS, ANDAMAN & NICOBARPosted 26 Mar
GEMService4 Documents
Category: Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS RAJKIRAN; E 337 Abnormal noise, vibration and inadequate discharge pressure observed from Dirty Oil Pump while operation Suspect impeller and worn out Same to be ov.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS RAJKIRAN; H 422 02 in nos wooden cupboards at NO Cabin deteriorated view fair and wear Same to be renewed as per sample; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS RAJKIRAN; E 341 Coolant leakage observed from Centre DA and Port DA view pin hole in coolant expansion tank and coolant line Same to be renewed repaired as per size.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS RAJKIRAN; L 310 06 ceremonial light sockets deteriorated and damaged due to fair wear and tear Same to be renewed repaired as per size and sample; Service Provider
Deadline
2 Apr 2025
View Details

Indian Coast Guard Repair & Maintenance Tender SOUTH ANDAMAN 2026 ICGS Vishwast Heat Exchanger & Condenser Cleaning

Indian Coast Guard

SOUTH ANDAMANS, ANDAMAN & NICOBARPosted 16 May
₹1.6 L
GEMService4 Documents
Category: Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS Vishwast; E 263 DA No 3 Heat exchanger to be removed and pressure tested for finding out of leaking tubes and if tubes found leaking tubes to be blanked as per pro.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS Vishwast; E 264 Leakage observed from FER educator suction pipeline Pipeline to be repaired and proved for satisfactory operation including pressure testing upto 8 .. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS Vishwast; E 265 High refrigerant pressure observed on AC condenser No 1 Suspect scale formation in condenser tubes Condenser to be chemical cleaned and proved for s..
Deadline
28 May 2026
View Details
Chat with us