Additional Chief Engineer (Proc.) invites “Request for Selection (RfS) of Solar Power Developer (SPD) with long-duration Energy Storage provider for Design, survey, supply, installation, testing, commissioning, operation & maintenance (5 years) of grid connected additional solar PV power plants along with Battery Energy Storage System (BESS) using Vanadium Redox Flow Battery (VRFB) technology and integrate with existing solar PV power plants and its associated net metering arrangement from COD of grid connected new solar PV power plants along with Battery Energy Storage System (BESS) using Vanadium Redox Flow Battery (VRFB) technology in Borsad division offices of MGVCL.
ADDITIONAL CHIEF ENGINEER (PROC.)
VADODARA, GUJARATPosted 22 May03 Months
NPROCUREGoods4 DocumentsOpen
Category: Supply,erection and Commissioning
Deadline
12 Jun 2026