Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-424; E 085
Indian Coast Guard
SOUTH ANDAMANS, ANDAMAN & NICOBARPosted 28 Mar
GEMService4 Documents
Category: Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-424; E 085 Both DA exhaust Line Sea water leakage and salt formation observed in both DA exhaust line In way job includes a Test water injection pipe and nozzle .. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-424; E 086 Chequered Plate Chequered plates carpet area approx 12 mtrs in engine room and water Jet are highly rusted deteriorated All plates along with supportin.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-424; E 087 Lagging lagging is required to be renewed at below mentined location a Hot lagging in engine room on port and stbd side Area 5 sqmtrs b Aluminium laggi.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-424; E 088 Port Gear box sea water cooling line Following jobs to be undertaken on Gear box sea water cooler cooling pipe line a Chemical cleaning of port gear bo..
Deadline
3 Apr 2025