As per deliverables stage 1 indicated at SCC,Receipt of new LARS from NIOT OEM and safe storage at
National Institute Of Ocean Technology (niot)
KANCHIPURAM, TAMIL NADUPosted 3 Dec
₹12.0 Cr
EMD: ₹24.0 L
GEMGoods4 Documents
Category: As per deliverables stage 1 indicated at SCC , Receipt of
new LARS from NIOT OEM and safe storage at shipyard
premises as specified in the scope of work, stage 2 point f ,
Removal of the existing A Frame onboard Ship incl. of two
hyd.cylinders, pistons, foundation and existing deep sea
winch. Handing over the two items to NIOT nominated
contractor with full Docs , Modification of ship structure and
other systems along with cabling, piping and necessary
power points as mentioned in the proposed modification
report approved by both class IRS and DNV in dry dock ,
Completion of intgr of LARS by successfully completing of
inst comm and HAT of new LARS onboard Ship alongwith
OEM Necessary support for SAT will be carried out by NIOT
and OEM , Cost for per kg steel weight renewal in case of
additional repair work with maximum additional steel work
be limited to 5 Tons , All risk insurance for new LARS and
from date of receipt at Shipyard till successful completion of
HAT and SAT All risk insurance for the ship, people, NIOT
property during drydock period as per NIT
Deadline
3 Mar 2026