The job Work of In-situ Internal Oxide Scale Measurement (IOSM) during AOH or COH and as and when required for Boiler of Unit No.3 and 4 at Sikka TPS.
Chief Engineer, Gujarat State Electricity Corporation Ltd., Thermal Power Station, Sikka - 361 140
JAMNAGAR, GUJARATPosted 6 Jun18 Months
₹7.5 L
EMD: ₹7,500
NPROCUREService4 DocumentsOpen
Category: Mechanical Works
Deadline
14 Jul 2025