TenderDekho Logo
Panel state-wide in Chhattisgarh

19 Panel Tenders in Chhattisgarh

Access 19 live Panel procurement tenders in Chhattisgarh state. Major buyers include Nmdc Steel Limited and All India Institute Of Medical Sciences (aiims). Combined opportunity value of ₹2.6 lakh. Key locations: Bastar, Dantewada

Live Opportunities
Location
19

1600026298 CONTROL TRANSFORMER,1600026304 CONTROL TRANSFORMER 750VA,1700007960 CONTROL TRANSFORMER,

Nmdc Limited

DANTEWADA, CHHATTISGARHPosted 9 Oct
EMD: ₹861
GEMGoods5 Documents
Category: 1600026298 CONTROL TRANSFORMER , 1600026304 CONTROL TRANSFORMER 750VA , 1700007960 CONTROL TRANSFORMER , 1600021675 TRANSFORMER 415V 1.5KVA , 1600021673 TRANSFORMER 415 110V 2KVA , 1600101314 0.05 KVA CONTROLLED TRANSFORMER 3777103 , 1700106203 Terminal Block 2.5sqmm KUT 2.5 , 1700011491 PVC CASING CAPING 2 50.8 MM , 1700011492 PVC CASING CAPING 1 25 MM , 1600126387 BRAKE LIMIT SWITCH , 1700006268 LIMIT SWITCHES , 2200001250 MICROPROCESSOR BASED MULTIFUNCTION METER , 1700002941 NUMERIC MOTOR PROTECTION RELAY , 2100001560 UNIVERSAL TOOL KIT 1005 , 1700092404 RUSTOLENE , 1700133881 Outdoor Feeder Pillar Box Panel , 1700003460 SWITCH PROXIMITY INDUCTIVE SENSOR 24VDC
Deadline
24 Oct 2026
View Details
Advertisement

Firewall,Logging and Analytics,Storage,Core Switch,Distribution Switch Main,SFP 10G,SFP 25G,QSFP 40

National Institute Of Technology (nit)

RAIPUR, CHHATTISGARHPosted 5 Oct
₹5.5 Cr
EMD: ₹11.1 L
GEMGoods3 Documents
Category: Firewall , Logging and Analytics , Storage , Core Switch , Distribution Switch Main , SFP 10G , SFP 25G , QSFP 40G , Distribution Switch H Hostel , Access Switch POE , Wi-Fi 7 Access Point , WLAN Controller , UTP Patch cord 0.5 Mtr , UTP Patch cord 2 Mtr , IO Face Plate , Patch panel , CAT 6 UTP Cable , Fiber Cable , 25 MM PVC Casing Capping Conduit , Rack 12U , Rack 9 U , LIU 6 Port , LIU 24 Port , Fiber patch cord , UPS , Network Management and Monitoring , 50x50 MM PVC Trunking , Laying Of UTP cable , OFC cable Laying , CAT6 Patch panel Installation , Fiber Splicing , Rack Installation and Dressing , Access Point Installation charges , Network Device installation testing and commissioning , 01 Manpower for Service and Support 3 years , 03 Year support, operation and maintenance
Deadline
26 Oct 2026
View Details