Mobilization And Demobilization Of Drilling Equipmenttools And Manpower For Lingra river site,Drill
Bharat Petroleum Corporation Ltd
ANGUL, ODISHAPosted 6 Aug
GEMGoods4 Documents
Category: Mobilization And Demobilization Of Drilling Equipmenttools
And Manpower For Lingra river site , Drilling of Borehole
including barge or platform setup at Lingra River 1st
Borehole 1st Location , Drilling of Borehole including barge
or platform setup at Lingra River 2nd Borehole 2nd Location
, Drilling of Borehole including barge or platform setup at
Lingra River 3rd Borehole 3rd Location , Drilling of Borehole
including barge or platform setup at Lingra River 4th
Borehole 4th Location , Drilling of Borehole including barge
or platform setup at Lingra River 5th Borehole 5th Location ,
Submission geotechnical investigation reports of Lingra river
Deadline
16 Aug 2025