TenderDekho Logo
Pipe Project state-wide in Andaman & Nicobar

Pipe Project Tenders in Andaman & Nicobar

Explore state-wide pipe project procurement opportunities in Andaman & Nicobar. Major buyers include Indian Army and Indian Coast Guard. Tender values range from ₹1.7 Lakh to ₹56.5 Lakh. EMD up to ₹43K. Procurement sources: Gem (5). Track active bids, eligibility criteria, and deadlines for this state.

Live Opportunities
National Reach
0

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS RAJSHREE, SRI

Indian Coast Guard

SOUTH ANDAMANS, ANDAMAN & NICOBARPosted 30 Jul
₹1.7 L
GEMService4 Documents
Category: Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS RAJSHREE, SRI VIJAYA PURAM; E41 Sea water leakage observed from Port DA sea water pump discharge pipeline and discharge purging cock pocket view base pocket threa.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS RAJSHREE, SRI VIJAYA PURAM; E42 Pin hole observed from AC condenser pump discharge pipeline Resulting leakage of sea water in FER bilges Pipe to be repaired and p.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS RAJSHREE, SRI VIJAYA PURAM; E 45 High pressure cut out operates frequently in AC system Suspect Condenser chocked Chemical cleaning of condenser to be carried o.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS RAJSHREE, SRI VIJAYA PURAM; E 46 Sea water leakage observed from Port DA water injection pipe DA exhaust system pipe near flanges On investigation found injecti..
Deadline
1 Aug 2025
View Details

CUCM integration on existing network,C6 cable 305 Mtrs,I and C black box and face plate,I and C PVC

Indian Navy

SOUTH ANDAMANS, ANDAMAN & NICOBARPosted 15 Jul
EMD: ₹22,755
GEMGoods3 Documents
Category: CUCM integration on existing network , C6 cable 305 Mtrs , I and C black box and face plate , I and C PVC casing capping , SWM 1310 and 1550 NM Europa 2000 Patch Cord , Gracefully removing rack with equipment , Shifting and Installation of 9 U Rack , Structure C 6 ABD , Power backup for NCN Rack , I and C 3 Core Power cable , 12 F OF cable , PCC 25 Mtrs , 20 mm PLBE , Joint Closer , Lucent Connecter SM patch cord 3M , I and C of MCB Switch box Switch , Earthing G Cable , OTB installation and supply , RCC chamber supply and installation , Pipe laying 300 Mtr , OFC cable laying 300 Mtr , Installation of Network 2 C 6 IO 40 Point , Fusion SJ 24 Nos
Deadline
5 Aug 2025
View Details

Refine Your Search

Quick filters based on popular searches

Popular
Top States
Top Cities
Top Organizations
Sources

Click any filter to narrow down your results • Applied filters shown with opacity