Pipeline Laying Installation by Open Trench Method,Pipeline Laying Installation by HDD Without Casi
Bharat Petroleum Corporation Ltd
ANGUL, ODISHAPosted 6 Dec
GEMGoods5 Documents
Category: Pipeline Laying Installation by Open Trench Method ,
Pipeline Laying Installation by HDD Without Casing , Long
Radius Bends 300 Class 90 Degree , Purging and
Inertisation of 4 Inch Pipeline Including Supply of Nitrogen ,
Hot Tapping Works , TCP Work , Supply Laying Termination
Glanding and Ferruling TCP Cables , Supply Laying
Termination Glanding and Ferruling of TCP Cables , Supply
Laying Termination Glanding and Ferruling TCP Cable ,
Supply Laying Termination and Glanding and Ferruling TCP
Cable , TLP Test Stations , Pipeline Laying Installation of
Above Ground Pipeline , Pipeline Laying Installation of Above
Ground Pipelines , Pipeline Laying and Installation of Above
Ground Pipeline , Supply of Assorted Pipe Fittings and
Flanges , Supply of Assorted Pipe Fittings and Flange ,
Supply of Assorted Pipe Fittings Flanges , Flanges , Supply
and Installation of 90 Degree Elbow R 1 Point 5D Rating 300
Class , Supply and Installations of 90 Degree Elbow R 1 Point
5D Rating 300 Class , Sockolet A105 SW , Unequal Tee A234
Gr WPB Charpy B 16 Point9 and 1 point 5D BW , Reducer
A234 Gr WPB Charpy BW , Supply of Plug Valves , Ball
Valves Underground , Erection of Valves As Per P and ID
Above Ground , Erection of the Valves As Per P and ID Above
Ground , Erection of the Valves As Per the P and ID Above
Ground , Radiography Test of Weld Joints , Radiography Test
of the Weld Joints , Field Instruments , Installation
Calibration Testing and Commissioning of Pressure Gauges ,
Civil Work Construction and Handing Over of Brick Valve Pit
As Per Tender Drawing
Deadline
6 Jan 2026