Design, Construction, Supply, Testing, commissioning of Pipe Water Supply Schemes with Electric Driven Pumps and IRON Removal Treatment Plant having Technology (Adsorption/ Nano Technology) of CSIR or certified by CSIR or any other Technology endorsed/ approved by GoI in the IRON affected areas of Sikti Bop District of Araira on turn-key basis with 03 months Trial Run after Commissioning and Comprehensive Operation and Maintenance of 60 months after successful completion of Trial Run Period under under P.H.Division, ARARIA.
Organization Not Specified
BIHARPosted 7 Aug
₹27.2 L
EMD: ₹55,000
EPROCURE-BIHAR5 DocumentsOpen
Deadline
17 Aug 2026