Design document of Trim System TS as per the SCC deliverables clause no 7 and DNV rules As per SCC
National Institute Of Ocean Technology (niot)
KANCHIPURAM, TAMIL NADUPosted 15 May
₹7.8 Cr
EMD: ₹15.5 L
GEMGoods4 Documents
Category: Design document of Trim System TS as per the SCC
deliverables clause no 7 and DNV rules As per SCC and SCC
Annexure 1 , Equipment realisation, complete development
of Trim System as per DNV approved Inspection, Test Plan
and DNV compliance document for final testing As per SCC
and SCC Annexure 1 , Final testing and product certification
of Trim System from DNV As per SCC and SCC Annexure 1 ,
Functionality Testing of Trim System as per acceptance
criteria of clause 6.1 of SCC along with training for operation
and maintenance and supply of system to NIOT As per SCC
and SCC Annexure 1 , All risk Insurance should be valid till
completion of acceptance test as per clause 6.1 of SCC and
supply to NIOT , Freight Charges
Deadline
18 Jun 2026