TenderDekho Logo
Pump Repair Kits city-wide in Bangalore

Pump Repair Kits Tenders in Bangalore

Access live Pump Repair Kits procurement tenders in Bangalore. Major buyers include Indian Army and Hindustan Aeronautics Limited (hal)

Location
Major Buyer
0

5989921977-89,5989921978-86,5989921979-83,5989921980-80,5989921981-77,5989921982-74,5989921983-71,5

Hindustan Aeronautics Limited (hal)

BANGALORE, KARNATAKAPosted 28 Jan
GEMGoods3 Documents
Category: 5989921977-89 , 5989921978-86 , 5989921979-83 , 5989921980-80 , 5989921981-77 , 5989921982-74 , 5989921983-71 , 5989921984-68 , 5989921985-65 , 5989921989-53 , 5989921990-50 , 59899211957-14 , 59899211958-11 , 59899211956-17 , 5989921976-92 , 59899211000-20 , 59899211001-17 , 59899211002-14 , 59899211003-11 , 59899211004-08 , 59899211005-05 , 59899211006-02 , 59899211018-63
Deadline
18 Feb 2025
View Details

Rear dickey door hings,Rear beeding,Drayaling assmy,Wheel Bearing front inner,Wheel bearing front o

Indian Army

BANGALORE, KARNATAKAPosted 11 Feb
GEMGoods3 Documents
Category: Rear dickey door hings , Rear beeding , Drayaling assmy , Wheel Bearing front inner , Wheel bearing front outer , Kunckle bearing , Kunckle Kit , Engine mounting , Left side window glass frame , Tail light and indicator cover , Driver side door hinge , Door rear, front right side rusty and broken portion thinkering, denting and gas welding , Cabin to potion leaking. The portion cutting and finishing and filling , Gas welding, tinkering and denting portion, duck door full, left side and right side and right side portion andbosy top leaking portion filing and finishing and painting , S No 01 to 11 all of parts moving and new parts fitting and engine tuning and wheel balancing and aligment and wheel road testing , Front brake pav change , Rear brake shoe change , Master cylinder assy change , Shok abosrber front change , The above mentioned parts removing the vehcile and new parts fitting labour charge , Both side front and brake shoe , Chains pocket kit , Engine pulling power weak Enigne remove and enigne full service with damage and burned, oil fuel and other require parts The engine mounting and testing , Veh full loom system checking and burned loom change and full relays and lights, full connections checking and full electircal sustem service and testing , Ignition key change , Door lock both side LH and RH change , Self starter assy repair service with burned and damaged parts armature, solonoid and brush holder and brush Armauture Solonoid and brush and brush holder change , Brake shoe front andrear change , Clutch assy , Wheel bearing , Head light doom , Packing Kit , Clutch plate set , The above mentioned parts removing and and new parts fitting labour charge , Hydrolic valve change , Tyre inflantion change , PVR Seat pressure pipe change , SPC aasy change , Door catch assy change , Door catch change , Bty cutt off switch , Fuel lifting water seprator , Fuel motor , Door Catch , Door catch , Coolent pipe change , PTO pum , Solent Chain , Hood warning light glass , Accelerator pedal sensor , AC gas , Pnecematic brake assy
Deadline
4 Mar 2025
View Details

Front brake shoe liner LH and RH,Liner rivit,Door mechanism Rh,Door handel,Door lock Rh,Hub oil sea

Indian Army

BANGALORE, KARNATAKAPosted 13 Feb
GEMGoods3 Documents
Category: Front brake shoe liner LH and RH , Liner rivit , Door mechanism Rh , Door handel , Door lock Rh , Hub oil seal , Hub lock washer , Brake shoe bolt , Returning spring , Mechanical labour charges for the removal of old items and fitment with new spares parts , Wiper blade , Reverse gear switch , Checking of eniter loom, finding out the electrical fault, repair of broken electrical wires, replacment of cables with labour charges , Self starter overhauling by rewinding the armature assy, field coil repair and repalcement of carbon brushes , Alternator overhaul , Startingb relay 24V , Startingb relay 12V , Ignition switch , Fuses 10 Amp, 15 Amp, 25 Amp and clips , Insulation tape , Electrical labour charges for repairing all broken electrical wires, replacement of fuses , Clutch plate and pressure plate , Release bearing , Flywheel bearing , Flywheel bolt , Flywheel facing , Lock washer , Door catch , Door lock , Fan belt , Side mirror , Headlight bulb assy , Headlight holder , Headlight relay , Brake light bulb and indicator bulb assy , Wiper arm , Brake booster front overhauling , Brake bosster rear overhauling , Clutch master cylinder , Clutch master cylinder yoke pin , Clutch booster , Gearbox top lathe work , Steering gear box assy , Engine mounting pad , Brake pad front , Cylinder head gasket , Tappet cover gasket , Ananond , Knuckle kit , Knuckle bearing , Shim , Front wheel bearing , Wheel alignment , Brake shoe , Meter worm , Cable Kit , Lock set , Wiring kit , Carbureator seal kit , Cda unit , Spark plug , Oil filter , Singer arm axle , Singer arm brush , Chai sprocket , Sprocket rubber , Wheel bearing , Yoke set , Manifold rubber , Packing , Air filter , Oil seal kit , indicator flasher , Ampere meter , Center stand , Center stand pin , Mirror , Clutch plate, stell plate, clutch hub and clutch centre , Clutch lathe work , Timing chain kit , Cylinder head valve , Valve oil seal , Cylinder head lathe work , Piston kit , Packing kit , O ring kit , Enigine bearing , Connection rod , Camshaft , Rocker , Chain sprocket , Tool box , Side shield , Shield lock , Foot rest , Sprocket bearing , Centre stand , Welding , carbureator seal kit , Singer arm bush , Centre stand pin , Front fork , Fuel tank cap , Computerised sensor scanning , Flywheel sensor
Deadline
6 Mar 2025
View Details

Wiper motor pipe,Steering horse pipe,Door lock,Gear box top repair and service with shaft and packi

Indian Army

BANGALORE, KARNATAKAPosted 17 Jul
GEMGoods3 Documents
Category: Wiper motor pipe , Steering horse pipe , Door lock , Gear box top repair and service with shaft and packing with lathe machine work , Above metioned parts removing the vehcile and after service fitting the veh and veh testing labour charge , Dor lock , Hood lifting pump repair service with oil seal kit and O rings lathe machine work , Hood lifting ramp repair service with full kit , Self starter repair and service with burning and damaged parts change , Diesel pipe line , Clutch master cylinder , Clutch booster , Isolation switch , Auxiliary gear box mounting , Auxiliary gear box bed bush and bolt , Starting trouble Rotary pump problem Rotary pump removing the vehicle and taken to the pump house and stripping checking all parts. , Pump full service and burned parts oil seals O rings, packing and other parts change and pump assembled and injector , The above all old parts removing the vehicle and new parts, repair parts, rotary pump removing after servicing fitting the vehicle , Body welding works and patchwork , Footrest welding works and patchwork , Gear box repair and service , Ball joint , Top gear bearing ring big , Top gear bearing small , Gear change finger , Gear shifting sleeve 1st and 2nd round , Gear shifter synchro ring 1st and 2nd round , Top Gear , Gear Shifter Sleeve 3rd and 4th , Synchro Cone , Shifter Pad , Buller Spring , Gearbox Packing Kit , Synchro Ball Kit , Release Bearing , Clutch Master Cylinder Assy , Clutch Booster , Popular Shaft and Cross Member Bolt , Gearbox Assembly Stripping Sr No c removing ad Gearbox cleaning ad rusty parts removing , The above all old parts removing the vehicle including gearbox and after service and repair. The Parts fitting including gearbox and testing. , Auxillary Mounting , Door Catch , Bumper Denting , Door Mechanism , Hood Lifting Pump Repair and Service , Relay 12 and 24V , Starting Problem - Rotary Pump not working reqd for Service, rotary pump removing the pumphouse and pump stripping, cleaning all parts. , Censor , Packing Kit , Roller , Positioner , Pump repair and service and assemble and testing, calibrating with computerised machine mechanical changes , Disel Lifting Pump , The above mentioned all parts including rotary pump removing. The veh and after repair service fitting including rotary pump
Deadline
28 Jul 2025
View Details

4x4 assy checkinfg and faulty removing full electric connection checking and mechanical fault remov

Indian Army

BANGALORE, KARNATAKAPosted 11 Sept
GEMGoods3 Documents
Category: 4x4 assy checkinfg and faulty removing full electric connection checking and mechanical fault removing and testing 4x4 , Ramp assy removing the veh and taken to machine shop, stripping, checking, cleaning all damaged and burned seals, spring O rings change and ramp assy and testing and fitting the veh hood operated , Transfer case mounting bracket , Transfer case mounting male and female nut and bolt , Transfer case gear box hanging assy , The above mentioned all parts removing the veh and after service fitting the veh and veh testing mechanical charges , Starting problem rotary pump not working, pump removing the veh and taken to the pump house and steipping all parts cleaning and checking following defective parts change Nozzle , Pump body damaged change , Positioner change , Packing kit , Tapper roller and valves , Pump full service and above mention parts fitting damaged packing seals change pump assy injector nozzle fitting and pump nozzle testing calibrating computerised machine , Transfer case mounting bolt male and female , The above mentioned all parts removing the veh including rotary pump and after sevice fitting the veh and veh starting trouble testing veh road testing mechanical charges , Steering gear box faulty removing the veh and taken to lathe machine shop stripping checking all parts oil seals warm shaft damaged warm , Door lock RH and LH , 4x4 assy checking and faulty removing and full electric connection checking and mechanical fault removing testing 4x4 , Relay and damaged wiring checking and relay , Gear box assy removing the veh and clutch plate pressure plate release bearing clutch housing removing and checked lutch plate charge , Pressure plate change , Release bearing change , Clutch housing change , Clutch boosterr change , Fly wheel skimming and finishing , The above mentioned old parts removing and gear box servicing all parts fitting and veh road testing mechanical charges , Exhaust brake system removing and full service and full service and fitting , Wiper assy removing and full service and fitting , Transfer case balancing bracket gear box hanging assy , Clutch master cylinder assy , Full electrical system checking and burning realy looms lights wiper system all service and fitting , The above mentioned all parts removing and fitting mchanical labour charges
Deadline
22 Sept 2025
View Details

Steering gear box overhauling kit,Front axel major repair lit bearing Oil seal Gasket kit lock wash

Indian Army

BANGALORE, KARNATAKAPosted 1 Oct
GEMGoods3 Documents
Category: Steering gear box overhauling kit , Front axel major repair lit bearing Oil seal Gasket kit lock washer bearing outer cone , Reverse gear union , Reverse gear conractor , Main relay set , 30A fuse chamber set , 4x4 contactor wall set , 4x4 adopter , 4mm wire , The above mention repair steering gear box remove and clean all parts and send to the lathwork rectified the fault replaced the damaged parts services and reassemble to fit the vehicle. , Clutch assy , Pressure plate set , Pressure release bearing set , Clutch master cylinder assy , Clutch repair master kit , Vacuum cylinder hose head assy , Clutch pedal bearing set , Clutch top rod assy , Synchorinzer cone , Synchorinzer ring , Shift slivering , Shifter assy , Reverse gear bearing , Extra gear bearing , Connection shifter rail , Main shaft oil seal , Gear box packing kit , Reverse gear wheel assy , Extra reverse gear wheel assy , Gear top fit assy , Gear sleeves assy , Ignition switch , Starting coil relay with base assy , Pump solenoid switch , 30 A fuse base assy set , 5mm wire , Door inches set , Door lock set , Main realy , Holding realy , The above mentioned break down veh remove the clutch assy housing clean the all parts replaced the damaged parts reassembles to fit the veh The above mentioned the gear box remove the gear box , 4x4 adopter assy , 4x4 connector valve assy , Door winding mechanism set , Wire 4mm , Break synchronizer ring , Break cylinder major repair kit , C washer set , The above mentioned 4x4 wiring check and replace the damged parts and burn wire and check the veh on road test done , Right door lock inches , Left door lock inches , The above mentioned door removed the damaged parts replace the door inches door lock and tilting and tinkering work completed to refit the veh check and tested , Wind screen replaced
Deadline
20 Oct 2025
View Details

Clutch assy,Pressure Plate Set,Pressure release bearing set,Clutch master cylinder assy,Clutch repa

Indian Army

BANGALORE, KARNATAKAPosted 4 Oct
GEMGoods3 Documents
Category: Clutch assy , Pressure Plate Set , Pressure release bearing set , Clutch master cylinder assy , Clutch repair master kit , Vaccum Cylinder hose head assy , Clutch pedal bearing set , Clutch top rod assy , Synchronizer cone , Sychronizer ring , Shift Slivering , Shifter assy , Reverse gear bearing , Extra gear bearing , Connection Shifter Rail , Main Shaft oil seal , Gear Box packing kit , Gear Box fit assy , Gear sleeves assy , The above mentioned gear box remove the gear box assy send to the lathwork rectify the fault replaced the all damaged parts and re-assembled the gear box. , The above mentioned clutch and gear box check to re-fit the veh Test the veh on rd trail run test done , Ignition Switch , Starting coil relay with base assy , Fuel solenoid switch , 30A fuse base assy set , 5mm Wire , Main Realy , Holding Realy , Fly Wheel Sensor , The above Break down veh mentioned unserviceable part remove and replace with new parts rectified the fault check and trail run on rd test done , Break master cylinder repair wk , Lock washer set , Vaccum Cylinder hose pipe head assy , Door Lock Set , Door Inches Set , LH Door Glass assy , Door Mechanism Set , Km Cable Assy , ACC Cable Assy , Steering Gear Box overhauling kit , Above mentioned damaged door lock mech and cable remove and replace break cylinder assy remove clean all parts to check the faulot , Wind Screen , The above mention unsv parts removed and replace with new spare parts and check to rectified the fault job , Brake Master Cylinder Assy Kit , Door lock sets , The above mention break cylinder assy remove to clean all parts to check the fault and replace the damage parts , Break Master Cylinder assy , Door Lock Sets , Cabin suspenders bush sets , The above mention break cylinder assy remove to clean all parts to check the fault and replace the damage parts rectifying the fault , The above mention unsv parts removed and replace with new spare parts and check to rectified the fault , Clutch top master cylinder assy , Pressure plate , Pressure release bearing , Clutch repair major kit , Cabin lifting hydraulich pump repair kit , The above mention unsv parts removed and replace with new parts and check to rectified the fault
Deadline
22 Oct 2025
View Details

Ramp assembly removing the vehicles and taken to the machine shop stripping all parts cleaning the

Indian Army

BANGALORE, KARNATAKAPosted 14 Oct
GEMGoods3 Documents
Category: Ramp assembly removing the vehicles and taken to the machine shop stripping all parts cleaning the burning oil seats springs O rings change and ramp assembled and tested , Exhaust brake full device and over hauling and testing , Transfer case mounting bracket , Transfer case mounting bolt male and female , Rotating Switch , Hand brake assembly , The above mentioned old parts removing and servicing new parts fitting mechanical charges and full electrical system checking and service , 4x4 assembly removing and checking electrifying fault defective and mechanical defective rectified and 4x4 assembly system operated and testing , Clutch booster , Above parts removing and fitting electrical system full checking and burned damaged looms and lighting service and testing electrical and mechanical labour charges , Brake shoe lining with rivet , Brake cylinder wheel cylinder front and rear , Brake M cylinder , Clutch cylinder , Sleeve cylinder , Brake drum skimming , Brake system full removing the vehicle brake drum skimming after fitting the drum, brake shoe lining fitting and above brake M cylinder , Self Starter assembly stripping checking armature field coil solenoid bendex brush brush holder damaged armature re-winding , Self assembly removing the vehicle stripping checking all parts armature field coil solenoid burned armature re- winding field coil , Clutch plate , Pressure Plate , Release bearing , Clutch master cylinder , Bty cult of switch 24V , Ignition switch , Fly wheel skimming and service , Cabin shock absorber , 4x4 assembly , The vehicle electrical system full checking and burned damaged looms change ignition switch battery cut off switch fitting and full light system service and testing charges , Gear box assembly removing the vehicle old clutch plate pressure plate release bearing fly wheel removing and gear box service , Exhaust brake system removing and electrical fault rectified and mechanical fault removing and brake system mounting the vehicle and brake tested , Ramp assembly repair service with damaged and burned oil seal springs O rings change and ramp assembled and tested , Van pump assembly not working repair service with new packing kit and pressure testing , Door lock assembly , Relay 12V and 24V , Door mechanism , The above mentioned all parts removing and new parts fitting and vehicle testing mechanical charges , All electrical system repair service burned looms and relay change full lighting system head lights tail lights indicators cabinets lights checking and service labour charge , Rotary switch , Ramp assembly repairs and service with damage seal kit spring and O rings , The above mentioned parts removing and new parts fitting
Deadline
1 Nov 2025
View Details

Indian Army Clutch & Gearbox Spare Parts Tender Bangalore Karnataka 2025 - 63 Items, Supply, Installation, Testing

Indian Army

BANGALORE, KARNATAKAPosted 25 Oct
GEMGoods3 Documents
Category: Clutch assy , Pressure Plate Set , Pressure release bearing set , Clutch master cylinder assy , Clutch repair master kit , Vaccum Cylinder hose head assy , Clutch pedal bearing set , Clutch top rod assy , Synchronizer cone , Sychronizer ring , Shift Slivering , Shifter assy , Reverse gear bearing , Extra gear bearing , Connection Shifter Rail , Main Shaft oil seal , Gear Box packing kit , Gear Box fit assy , Gear sleeves assy , The above mentioned gear box remove the gear box assy send to the lathwork rectify the fault replaced the all damaged parts and re-assembled the gear box. , The above mentioned clutch and gear box check to re-fit the veh Test the veh on rd trail run test done , Ignition Switch , Starting coil relay with base assy , Fuel solenoid switch , 30A fuse base assy set , 5mm Wire , Main Realy , Holding Realy , Fly Wheel Sensor , The above Break down veh mentioned unserviceable part remove and replace with new parts rectified the fault check and trail run on rd test done , Break master cylinder repair wk , Lock washer set , Vaccum Cylinder hose pipe head assy , Door Lock Set , Door Inches Set , LH Door Glass assy , Door Mechanism Set , Km Cable Assy , ACC Cable Assy , Steering Gear Box overhauling kit , Above mentioned damaged door lock mech and cable remove and replace break cylinder assy remove clean all parts to check the faulot , Wind Screen , The above mention unsv parts removed and replace with new spare parts and check to rectified the fault job , Brake Master Cylinder Assy Kit , Door lock sets , The above mention break cylinder assy remove to clean all parts to check the fault and replace the damage parts , Break Master Cylinder assy , Door Lock Sets , Cabin suspenders bush sets , The above mention break cylinder assy remove to clean all parts to check the fault and replace the damage parts rectifying the fault , The above mention unsv parts removed and replace with new spare parts and check to rectified the fault , Clutch top master cylinder assy , Pressure plate , Pressure release bearing , Clutch repair major kit , Cabin lifting hydraulich pump repair kit , The above mention unsv parts removed and replace with new parts and check to rectified the fault
Deadline
5 Nov 2025
View Details