TenderDekho Logo
Pvc Flooring city-wide in Kota

Pvc Flooring Tenders in Kota

Access live Pvc Flooring procurement tenders in Kota. Major buyers include Indian Army and Hindustan Petroleum Corporation Ltd. Combined opportunity value of ₹1.4 lakh

Location
Major Buyer
0

17 MM Profile Strip for theatre stairs including stone cutting & Installation,Automatic Motorized S

Indian Army

KOTA, RAJASTHANPosted 27 Dec
EMD: ₹1.4 L
GEMGoods7 Documents
Category: 17 MM Profile Strip for theatre stairs including stone cutting & Installation , Automatic Motorized Slider including curtain , Laminated 8 mm wooden flooring installation including 3 mm foaming work for stage (60x30 feet) & wir , Visitors Red Push back Auditorium Chair set of 144 including Installation , PA Equipment
Deadline
17 Jan 2025
View Details

SURFACE PREPARATION,PRIMER LPG NON LPG LINE,INT COAT-MIO-1 COAT,FINAL COAT-PU-2 COATS,SURFACE PREPR

Hindustan Petroleum Corporation Ltd

KOTA, RAJASTHANPosted 10 Sept
GEMGoods4 Documents
Category: SURFACE PREPARATION , PRIMER LPG NON LPG LINE , INT COAT-MIO-1 COAT , FINAL COAT-PU-2 COATS , SURFACE PREPRATON half to two inch line , PRIMER half to two inch line , INT COAT MIO 1 COAT half to two inch line , FINAL COAT PU 2 COATS half to two inch line , ETCH EZP PRIMER GI PIPES , SYNTH ENML PAINT GI PIPES , PAINT VALVES and STRAINERS , SURFACE PREPARATION MS STRUCTURES SUPPORT , PRIMER MS STRUCTURES SUPPORT , INT COAT MIO 1 COAT MS STRUCTURES and SUPPORT , FINAL COAT PU 2 COATS MS STRUCTURES and SUPPORT , PAINTING BUILDING PRIMER AND FINISH COAT , LETTERING UPTO 2 , LETTERING 2 4
Deadline
22 Sept 2025
View Details

SURFACE PREPARATION,PRIMER LPG NON LPG LINE,INT COAT-MIO-1 COAT,FINAL COAT-PU-2 COATS,SURFACE PREPR

Hindustan Petroleum Corporation Ltd

KOTA, RAJASTHANPosted 21 Sept
₹23.6 L
GEMGoods4 Documents
Category: SURFACE PREPARATION , PRIMER LPG NON LPG LINE , INT COAT-MIO-1 COAT , FINAL COAT-PU-2 COATS , SURFACE PREPRATON half to two inch line , PRIMER half to two inch line , INT COAT MIO 1 COAT half to two inch line , FINAL COAT PU 2 COATS half to two inch line , ETCH EZP PRIMER GI PIPES , SYNTH ENML PAINT GI PIPES , PAINT VALVES and STRAINERS , SURFACE PREPARATION MS STRUCTURES SUPPORT , PRIMER MS STRUCTURES SUPPORT , INT COAT MIO 1 COAT MS STRUCTURES and SUPPORT , FINAL COAT PU 2 COATS MS STRUCTURES and SUPPORT , PAINTING BUILDING PRIMER AND FINISH COAT , LETTERING UPTO 2 , LETTERING 2 4
Deadline
3 Oct 2025
View Details

MS ERW 250NB,MS ERW 200NB,MS ERW 150 Nnb,MS ERW 75 NB,SORF FLANGE 100 NB 150,SORF FLANGE 150 NB 150

Hindustan Petroleum Corporation Ltd

KOTA, RAJASTHANPosted 11 Jun
EMD: ₹1.0 L
GEMGoods3 Documents
Category: MS ERW 250NB , MS ERW 200NB , MS ERW 150 Nnb , MS ERW 75 NB , SORF FLANGE 100 NB 150 , SORF FLANGE 150 NB 150 , 45 Deg Elbow 150 NB , 45 Deg Elbow 200 NB , 90 Deg Elbow 150 NB , 90 Deg Elbow 200 NB , BLRF 150 NB 150 , CAF Gasket Style 20 , 100 NB , CAF Gasket Style 20 , 15 NB , CAF Gasket Style 20 , 150 NB , CAF Gasket Style 20 , 25 NB , CAF Gasket Style 20 , 50 NB , GI PIPE 15 NB , GI PIPE 25 NB , GI PIPE 50 NB , GI 45 Deg Elbow 50 NB , GI 90 Deg Elbow 25 NB , GI 90 Deg Elbow 50 NB , GI BLRF FLANGE, 150Cl, 50 NB , GI SWRF FLANGE, 150Cl, 25 NB , GI SORF FLANGE, 150Cl, 50 NB , GI SWRF FLANGE, 150Cl, 15 NB , 15 NB HALF COUPLING , 15 NB GI TEE ONE SIDE THREADED , 25 x 25 x 15 mm GI UnEqual TE , 15 NB 90 DEG GI SOCKET WELD , 15 mm Sockolet, Sch 80 , STUD BOLT 1 by 2Inch , LENGTH 55 MM , STUD BOLT 1 by 2Inch , LENGTH 70 MM , STUD BOLT 1 by 2Inch , LENGTH 85 MM , STUD BOLT 3 by 4Inch , LENGTH 100 MM , STUD BOLT 5 by 8Inch LENGTH 90 MM , SUPPLY AND INSTALLATION OF DOUBLE HYDRANT , SUPPLY AND INSTALLATION OF MONITORS , SUPPLY AND INSTALLATION OF HOSE BOX , HOSE FIRE FIGTING , SUPPLY AND INSTALLATION OF GATE VALVE 100 NB , BALL VALVE 15NB 800 , SUPPLY AND INSTALLATION OF Y STRAINER , SUPPLY AND INSTALLATION OF DELUGE VALVE , SUPPLY AND INSTALLATION OF SPRAY NOZZL WITH COUPLING , SUPPLY AND INSTALLATION OF FLP PRESSURE SWITCH , SUPPLY AND INSTALLATION OF QUARTZOID BULB , SUPPLY AND INSTALLATION OF GLYCERINE FILLED PRESSURE GAUGE 0 20 KGF by CM2 , SUPPLY AND INSTALLATION OF SOLENIOD VALVE WITH COIL , SUPPLY AND WRAPPING OF WRAPPING COATING , FABRICAITON OF PIPELINE , LAYING OF PIPELINE A by G , LAYING OF PIPELINE B by G , SURFACE PREPARATION SAND BLASTING , PRIMER MS ERW PIPES , MIO MS ERW PIPES , FINAL COAT MS ERW PIPES , ETCH ,EZP PRI and SYNTH ENML GI , BACK FILLING , BRICK MASONARY , EXTERNAL PLASTER 30 MM , EXCAVATION , SUPPLY AND LAYING OF HUME PIPE 150 NB , MS INSERTS PLATE ,ANGLE CHANNEL ETC , PCC , RCC M20 GRADE , S,F,E and W OF STRUCTURAL STEEL , SUPPLY OF GI HONEY COMB GRATINGS , REINFORCEMNENT STEEL , LETTERING UPTO 2 Inch , ERECTION OF VALVES , HYDRANT , MONITORS, HOSE BOXES , Fab Erect Air Station with Ins , AIR FILTER REGULATORS , Fabrication and Erection of 15 NB and 25 NB AIR LINE , S,F,E OF PIPE SUPPORTS , S,F,E, OF HAND RAILSHAND RAILS
Deadline
22 Jun 2026
View Details